CLW PRESENTLY MANUFACTURE THE FOLLOWING ELECTRIC LOCOMOTIVES:
Presently CLW is manufacturing the following types of 3-phase electric locomotives and their technical details are given below:
WAG-9HC TIWN Freight Locomotive
WAP5 - Push Pull Enabled Aerodynamic Loco
WAP-5 Passenger Locomotive
WAG-9H Freight Locomotive
IMPORTANT DEVELOPMENTS & INNOVATIONS
INTRODUCTION
CLW started Traction Motor manufacture from 1969 with Alsthom design of MG-1580 motors and TAO-659 motors and switched over to HS15250A, 850 HP Traction Motors for which technology was received from Hitachi, Japan. HS15250A Traction Motor production started in 1988-89. *
Now with the advent of three phase technology of locomotives from Bombardier Transportation, Switzerland, CLW has geared up to manufacture 1000 HP and 1500 HP state-of-the-art 3- Phase Traction Motors for freight (WAG-9) and passenger (WAP-5 & WAP-7) locomotives.
The different type of Traction Motors manufactured at CLW are following:-
3-PHASE TRACTION MOTOR TYPE 6FRA6068 & 6FXA 7059
3-Phase Tracation Motors type 6FRA6068 for WAG-9 and WAP-7 locomotives & 6FXA7059 for WAP-5 locomotive are being manufactured indigenously by CLW since the financial year 1998-99 & 1999-2000 respectively.With the production of 3-phase Traction Motor,CLW has entered the era of state of the art,3-phase technology.
(3-phaseTM type 6FRA6068)
(3-phaseTM type 6FXA 7059)
* Produciton of Hiachi Traction Motor was stopped due to discontinuation of production of conventional Electric Locomotive type WAP-4/ WAG-7 from 2016-17.
IMPORTANT DEVELOPMENTS & INNOVATIONS IN ELECTRIC LOCOMOTIVES
Aerodynamic Profiling (WAP-5)
High Speed loco 200 KMPH
Head on Generation Green Initiative
High Horse Power Locomotive (9000 HP)
Multi Operation Push Pull of WAP-5 Locomotive
Long haul operation of freight Trains
High Reach Pantograph
Project ahead with technological advancement in locomotive Manufacturing
DETAILED SUPPLY & BALANCE POSITION OF MAJOR EQUIPMENT FROM CLW TO ZONAL RLYSup to 31 JULY 2025
(RSP)
Traction Motor ( 3-Phase) ( QTY IN NOS)
Sl.
P.B.No. / Req. No. / JPO No.
Rly. / Shed
Qty. dem.
Supplied upto
24-25
Supplied during 25-26
Qty. balance
Remarks
PB no. 1181/19-20, 426/20-21, 341/21-22,
245/22-23,195/23-24,150/24-25,142/25-26
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
Total Qty - ( 100 nos)
CR
10
08
02
03 in DEC19+03 in APR 24 (AQ) +02 in JUNE 24 (AQ)
ER
05
05
--
01 in Sep’21 +04 in Feb22
ECR
09
09
--
06 in FEB22+ 03 in FEB’22
ECoR
09
09
--
06 in APR’22+02 IN FEB’23(VSKP)+01in JAN 25(ANGL)
NR
10
10
--
03 IN OCT 19+03 in Mar’22+03 in SEPT’22+ 01 in MAR 24(LDH)
NCR
05
05
-
02 in JAN22 +03 in Feb22
SR
09
09
--
04 in Nov 19+ 04 in FEB’22+01 in APR 24 (RPM)
SCR
10
10
--
04 IN NOV19 KZJ + 03 in DEC19+02 in Mar’22+01 in APR’22
SER
09
09
--
03 IN NOV19 BKSC+01 SRC IN NOV19+ 03 in FEB’22+ 02 in FEB’22
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
Total Qty – 10 L/sets.
CR
01
01
ECR
01
01
--
01 in APR’22
ECoR
01
01
--
01 in MAR 24(VSKP)
NR
01
01
--
01 in Sept23(LDH)
SR
01
01
-
01 in Mar’23(RPM)
SCR
01
01
SER
01
01
--
+01 in Mar’22
SECR
01
01
--
01 IN JAN’23(BIA)
WR
01
01
--
01 in JUN 23(BL)
WCR
01
01
TOTAL
10
07
03
3.
PB no. 1235/22-23,278/23-24, 192/24-25
(Allotted Vide Rly.Bd L/No- 2022/Elect.(TRS)/441/1 dt 06.04.22)
Total Qty – 15 L/sets.
CR
01
01
ER
01
01
--
01 in Sept23(HWH)
ECR
01
01
ECoR
01
01
--
+ 01 in MAR 24(VSKP)
NR
01
01
--
01 IN FEB 24(GZB)
NCR
01
01
-
01 in Mar’23(CNB)
NER
01
01
--
01 in JAN 24(GD)
NFR
01
01
--
01 in Oct 23(MLDT)
SR
01
01
--
01 in MAY 24(RPM)
SCR
01
01
SER
01
01
--
01 in June’22
SWR
01
01
--
01 in June’22(KJM)
SECR
01`
01
--`
01 in May ‘23(BIA)
WR
01
01
--
01 in JUN 23(BL)
WCR
01
01
TOTAL
15
11
04
Grand Total
55
45
10
2X500 KVA HOTEL LOAD CONVERTER (3-Phase) (D&D) ( QTY IN SET )
Sl.
P.B.No. / Req. No. / JPO No.
Rly. / Shed
Qty. dem.
Supplied upto
24-25
Supplied during 25-26
Qty. balance
Remarks
PB no.1290/20-21,369/21-22 ,271/22-23,220/23-24,
59/24-25, 54/25-26
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 375 sets
(Re-distribution vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1
dt 16.09.21) Total Qty – 150 sets.
(Re-distribution vide Rly.Bd L/No- 2023/Elect.(TRS)/441/1
dt 04.07.21) Total Qty – 187 sets.
Re-distribution vide Rly.Bd L/No- 2023/Elect.(TRS)/441/1
dt 13.05.24
ER
31
31
--
01 IN MAY21+01 IN Aug 21+12 in JULY 22(DD)+ 02 in Aug’22(DD)+02 in JAN 24(KPA)DD+06 IN SEP 24(KPA)DD+07 IN MAR 25
ECoR
21
21
--
04 IN APRIL21+01 IN MAY21+11 in JULY 22(DD)+ 04 in JAN 24(VSKP)DD+01 IN MAR 25
SR
35
35
--
01 IN APRIL21(RPM)+ 03 in JULY21+01 IN Aug 21+22 in JULY 22(DD) +03 IN SEP 24(RPM)DD+02 NOS IN DEC 24(RPM) +02 IN FEB 25(ED)DD+01 IN MAR 25(DD)
SCR
24
22
02
+08 in JULY 22(DD)+Excess sup 46 nos. in JULY22(DD) (CR-10,ECR-01,NR-11,SER-07,SECR-02,WR-03,WCR-12) +01 in Sept23 (LGD)+ 02 in JAN 24(LGD)DD +06 IN SEP 24(LGD)DD+01 IN OCT 24(LGD)DD+04 IN MAR 25
CR
22
22
--
01 IN SEP 24(KYN)DD+01 IN SEP 24(AQ)DD+02 IN NOV 24(KYN)DD+08 IN MAR 25
ECR
02
02
--
01 IN AUG 24 (GMO)(DD)
NR
16
16
--
03 IN SEP 24(GZB)DD+02 IN MAR 25
SER
08
08
--
+01 IN MAR 25
SECR
04
04
--
01 IN SEP 24(BIA)DD
WR
04
04
--
+01 IN OCT 24(BRCY)DD
WCR
20
20
--
01 IN SEP 24(TKD)DD+07 IN MAR 25
TOTAL
187
185
02
Sup. Before re-distribution SER-06 in 21-22,SECR-01 in 21-22,WCR-04 in 21-22+
Adjusted the supply position after Re-distribution
26 DD+08 To Kyn In Aug18+08 In Nov18+04 In Dec18+25 in April 20 (DD)
14 in Feb 22 (DD)
EcoR/VSKP
57
57
--
As Per L/N.- Wat/Trs/S-6/ 83 Dt.- 02.01.2014+ 25 in Mar’22(DD)+ 20 NOS. IN FEB’24(WAT)(DD)
ECR /GOMOH
85
85
--
04 In Dec18+30 in Sept23(GMO)DD+ 10 IN NOV 23(GMO)DD++ 41 IN NOV 23(DDU)DD
ER /
194
194
--
30 DD IN MAR20(HWH) +04 in Mar’22(HWH)+02 in june’22(HWH) + 12 IN NOV 23(HWH)DD+ 36 IN APR’24(ASN)DD+ 24 IN MAY’24(ASN)DD+24 IN JULY ‘24(ASN)DD+40 IN AUG 24(ASN)DD+22 IN SEP 24(ASN)DD
NCR /
85
85
--
04 In Dec18+08in Feb19+ 025 in FEB’22+17(12+5) IN APR23 JHS(DD)+04 in JULY 23 (CNB) DD
NR /
85
85
-
( 08 ADJUSTED WITH PANTO AM-92 IN NOV18) 21dd+20 Nos In Nov18+18 In Dec18+12 in March’19(DD)+12 GZB IN May19(DD)+ 02HR/DD/GZB SEP19
SCR /
85
85
--
20DD+08AR In Feb19+(4HR+12AR In Mar19)+16 AR to KZJ MAY19+08 AR BZA MAY19+15 in Mar’22(DD)+ 02 in May ‘23(LGD)DD
SECR /
41
41
--
08 In Feb19) + 02 in Mar’22+ 02 in Mar’22+14 nos MAR’24(BSP)DD
SER /
70
70
--
08 In Dec18+8ar In Mar19+08 in April’19+08AR to SRC in May19+08AR to SRC in June19+16 IN JULY19+ 10 DD IN MAR20 (SRC) +04 nos MAR’24(TATA)DD
SR /
43
43
--
01 in FEB 22+ 12 IN NOV 23(RPM)DD)+ 07 NOS. IN FEB’24(ED)(DD)+ 12 in DEC23 ED(DD)
WCR /
85
85
--
+10 in Mar’22(DD)+ 36 in APR’22 TKD(DD) +09 in Sept23(TKD)DD
WR / BRCY/BL
85
85
-
Vide Cee/Wr/Hq’s L/N.- El 91/39/1 Dt.- 09.01.15, 02 Nos Supplied In Mar’17+04 In July18+15 In Aug18+08 In Jan19+08 In Jan19+04 In Feb19+12 Nos HR in June19(DD)to BL+12 Nos HR in AUG19(DD) to BL+18 Nos in SEP2019/DD BRCY+02 HR/DD/BL SEP19
21 in Feb 22 (KYN)(DD) +10 IN SEPT’22(DD)BSL+07 in JUN 23(KYN) DD+02 IN JAN 24(KYN)(DD)
ER /
78
40
38
+02 IN SEP 24(ASN)DD+14 IN OCT 24(ASN)DD+16 NOS IN DEC 24(ASN)+08 IN JAN 25(JMP)
ECR /
110
110
--
+ 05 IN NOV 23(DDU)DD+15 in DEC23 DDU(DD) +12 IN JAN 24(DDU)(DD) + 26 NOS. IN FEB’24(DDU)(DD) )+ 12 NOS. IN FEB’24(GMO)(DD)+40 nos MAR’24(DDU)DD
NR
460
460
--
24 AR in JUNE19+12 HR (DD) to GZB in June19+ 12 Nos HR ,DD GZB JULY19 +10HR/DD/GZB SEP19 +02 IN JAN20+10 IN June21(DD)+ 10 IN Nov 21(DD)+ 10 in Feb 22 (DD)+ 06 in OCT’22(DD)/KJGY+04 inNOV’22(DD)(LDH) +32(10+12+10) in DEC’22(DD)(GZB) +24(6+6+12) IN JAN’23(GZB)DD+ 19 IN FEB’23(GZB)(DD) +10 in May ‘23(GZB)DD+96 in Sept23 (LDH) DD +07 in Sept23(TKD)DD+20 in Sept23(KJGY)DD+ 30 IN NOV 23(KJGY)DD++ 35 IN NOV 23(GZB)DD++ 30 IN NOV 23(LDH/E)DD+12 in DEC23 LDH(DD) 24 IN JAN 24(LDH)(DD)+ 21 IN JAN 24(KJGY)(DD)
NCR
200
200
--
16 in JULY 23 (CNB) DD+13 inSept23(JHS) DD+ 41 IN NOV 23(CNB)DD+ 51 IN NOV 23(JHS)DD+65 in DEC23 CNB(DD)+ 14 in DEC23 JHSD(DD)
NWR
104
104
--
25 in Sept23(BGKT)DD+36 in DEC23 BGKT(DD) +26 nos MAR’24(BGKT)DD + 17 IN APR’24(BGKT)DD
SCR
346
186
160
40 (5+35) in May’23(LGD)DD+24 IN OCT 24(LGD)DD+24 IN NOV 24(BZA)DD+32 IN NOV 24(GY/D)DD+16 NOS IN DEC 24(LGD)+ 24 NOS IN DEC 24(BZA)+ 12 NOS IN DEC 24(MLY) )+10 IN JAN 25(BZA) +04 IN JAN 25(MLY)
SECR
32
32
--
12 IN NOV 24(BIA)DD)+20 IN JAN 25(BIA)
WR
520
520
--
56 HR/DD TO WR(46BRCY+10BL)+12 HR/DD BRCY NOV19 + 54 in DEC19 + 28 in JAN20(BRCY) +10 IN June21(DD)+ 10 IN Aug21(DD/BL) +05 in OCT’21+ 178(25+153) nos. adjusted from PB 249/23-24+30 in Sept23(BRCY)DD+30 in Sept23(VTA)DD+25 in Sept23(BL)DD)+ 16 NOS. IN FEB’24(BRCY)(DD) )+ 12 NOS. IN FEB’24(VTA)(DD) + 08 IN MAY’24(VTA)DD
WCR
110
110
--
08 in Nov’21+02 in APR’22+12 in Sept23(ET)DD+20 in Sept23(NKJ)DD+11 in Sept23(TKD)DD+ 08 IN NOV 23(TKD)DD+ 25 IN NOV 23(NKJ/D)DD+15 in DEC23 TKD(DD) +09 IN JAN 24(NKJ)(DD)
66 nos MAR’24(DDU)DD+ 24 IN APR’24(GMO)DD+ 24 IN APR’24(DDU/D)DD+ 24 IN MAY’24(GMO)DD+ 24 IN MAY’24(DDU)DD+ 24 IN MAY’24(BJU)DD+ 24 IN MAY’24(PTRU)DD+ 36 IN JUNE’24(GMO)DD+24 IN JUNE’24(BJU)DD+22 IN JUNE’24(PTRU)DD+
NR
203
203
--
47 IN FEB’23(GZB)(DD) 12 in Mar’23(GZB)DD+36(12+12+9+3) IN APR 23 GZB(DD) +29 in Sept23(TKD)DD+03 IN JAN 24(KJGY)(DD) )+ 10 NOS. IN FEB’24(LDH)(DD) )+ 06 NOS. IN FEB’24(KJGY)(DD) + 06 IN MAY’24(LDH)DD+ 06 IN MAY’24(KJGY)DD+48 IN NOV 24(AMV)DD
NCR
87
87
--
07 in DEC23 CNB(DD) +12 IN JAN 24(JHS)(DD) )+ 12 NOS. IN FEB’24(CNB)(DD) )+ 38 NOS. IN FEB’24(JHS)(DD) )+18 nos MAR’24(CNB)DD
NER
14
14
--
04 IN JAN’23(GD) + 10 IN NOV 23(GD)DD
NFR
05
05
--
05 nos MAR’24(NGT)DD
SECR
114
04
110
+04 IN JAN 25(BIA)
SCR
28
28
-
28 in May ‘23(LGD)DD
SER
-
-
SWR
06
06
--
+06 IN JAN 24(KJM)(DD)
WR
35
35
--
03 in OCT’21+02 in Nov’21+15 in DEC21+ 04 in FEB’22+ 16 in FEB’22+ 08 in FEB’22+08 in Feb22+(4+4+6)=14 in APR’22+10 NOS. in JULY 22(DD) +50(12+06+10+10+12)(Excess sup. 49nos) in DEC’22(DD)(BRCY)+ (Excess sup. 60nos) in FEB’23(DD)(BRCY)
+ 44(12+12+08+12) in Mar’23(BRCY)DD+25(10+07+08)IN APR 23 BRCY(DD) * 25+153=178 shifted to PB No.128/23-24 46 NOS SHIFTED TO 128/24-25
WCR
167
167
--
+03 IN JAN 24(NKJ)(DD) )+ 42 NOS. IN FEB’24(NKJ)(DD)+38 nos MAR’24(NKJ)DD+ 38 IN APR’24(NKJ)DD+ 22 IN MAY’24(NKJ/E)DD+ 12 IN JUNE’24(NKJ/E)DD+ 12 IN JUNE’24(NKJ/D)DD
TOTAL
981
871
110
4.
PB NO.1238/23-24, 95/24-25, 89/25-26
TOTAL QTY.=1000 NOS
(Allotted Vide Rly.Bd L/No- 2023/Elect.(TRS)/441/1 dt 11.04.2023)
22 IN JAN 24(KYN)(DD) )+ 16 NOS. IN FEB’24(KYN)(DD) 12 IN NOV 24(AQ)DD+12 NOS IN DEC 24(AQ)+ 21 NOS IN DEC 24(PA/D)+ 16 NOS IN DEC 24(BSL)
ECR
181
181
--
02 IN JUNE’24(PTRU)DD+31 IN JULY’24(DDU/D)DD+12 IN JULY ‘24(BJU)DD+24 IN JULY ‘24(PTRU)DD+04 IN AUG 24(DDU/D)DD+24 IN AUG 24(BJU)DD+12 IN AUG 24(PTRU)DD+36 IN SEP 24(BJU)DD+06 IN SEP 24(PTRU)DD+23 IN OCT 24(BJU)DD+07 IN NOV 24(BJU)DD
NCR
183
183
--
20 nos MAR’24(CNB)DD+12 nos MAR’24(JHS)DD+ 05 IN APR’24(JHS)DD+ 24 IN APR’24(CNB)DD+ 24 IN MAY’24(CNB)DD+ 12 IN JUNE’24(CNB)DD+30 IN JULY ‘24(CNB)DD+31 IN SEP 24(CNB)DD+06 IN NOV 24(JHS/D)DD+19 NOS IN DEC 24(CNB)
NER
129
105
24
+ 26 IN NOV 23(GD)DD+12 in DEC23 GD(DD) + 24 IN MAY’24(GD)DD+ 12 IN JUNE’24(GD)DD+11 IN JULY ‘24(GD)DD+12 NOS IN DEC 24(IZN/D)+ 08 NOS IN DEC 24(SYH)
NFR
07
07
--
07 nos MAR’24(NGT)DD
SECR
118
118
SWR
06
6
--
06 IN JAN 24(KJM)(DD)
WCR
114
46
68
24 IN OCT 24(ET)DD+06 IN OCT 24(NKJ/D)DD+16 NOS IN DEC 24(ET)
TOTAL
1000
627
373
5.
PB no. 29/23-24,105/24-25, 99/25-26
(Allotted Vide Rly.Bd L/No- 2023/Elect.(TRS)/441/1 dt 02.01.2024)
Total Qty – 6000 nos.
CR
456
456
ER
324
324
ECR
744
744
ECoR
192
192
NR
660
660
NCR
216
216
NER
324
324
NWR
48
48
NFR
132
132
SR
180
180
SECR
372
372
SCR
624
624
SER
744
744
SWR
252
252
WR
228
228
WCR
504
504
TOTAL
6000
6000
6.
PB no. 794/25-26
(Allotted Vide Rly.Bd L/No- 2025/Elect.(trs)/441/1
Dt-05.05.2025
Total Qty – 1500 nos
CR
280
280
ER
170
170
ECR
210
210
NR
200
200
NCR
50
50
NER
80
80
NWR
5
5
WR
155
155
WCR
350
350
TOTAL
1500
1500
GRAND TOTAL
12481
4300
8181
128 nos Air raise panto adjusted against High Reach Panto (NR-36,SCR-44,SER-48)
304 nos Direct Delivery high reach Pantograph to sheds.
15 nos AM92/12 pantograph (6 nos CR, 2 nos ECoR,06 nos NR, 01 nos SR) supplied which adjusted against High reach pantograph
138 nos High Reach pantograph spared from CLW
High Speed Pantograph ( AM-92 Type ) ( QTY IN NOS )
This is the Portal of Indian Railways, developed with an objective to enable a
single window access to information and services being provided by the