DETAILED SUPPLY & BALANCE POSITION OF MAJOR EQUIPMENT FROM CLW TO ZONAL RLYS up to 31 AUG 2023
(RSP+PO)
Traction Motor ( 3-Phase) ( QTY IN NOS)
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
-
|
PB no. 1181/19-20, 426/20-21, 341/21-22,
245/22-23,195/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
Total Qty - ( 100 nos)
|
CR
|
10
|
03
|
|
07
|
|
03 in DEC19
|
ER
|
05
|
05
|
|
--
|
|
01 in Sep’21 +04 in Feb22
|
ECR
|
09
|
09
|
|
--
|
|
06 in FEB22+ 03 in FEB’22
|
ECoR
|
09
|
08
|
|
01
|
|
06 in APR’22+02 IN FEB’23(VSKP)
|
NR
|
10
|
09
|
|
01
|
|
03 IN OCT 19+03 in Mar’22+03 in SEPT’22
|
NCR
|
05
|
05
|
|
-
|
|
02 in JAN22 +03 in Feb22
|
SR
|
09
|
08
|
|
01
|
|
04 in Nov 19+ 04 in FEB’22
|
SCR
|
10
|
10
|
|
--
|
|
04 IN NOV19 KZJ + 03 in DEC19+02 in Mar’22+01 in APR’22
|
SER
|
09
|
09
|
|
--
|
|
03 IN NOV19 BKSC+01 SRC IN NOV19+ 03 in FEB’22+ 02 in FEB’22
|
SECR
|
09
|
09
|
|
--
|
|
04 IN NOV19+05 in Mar’22
|
WR
|
05
|
05
|
|
--
|
|
03 IN DEC19+ 02 in FEB’22
|
WCR
|
10
|
10
|
|
--
|
|
03 IN JAN20+04 in Mar’22+03 in Mar’22
|
-
|
PB no. 1291/20-21, 370/21-22, 272/22-23,
221/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty - ( 150 nos)
|
CR
|
12
|
|
|
12
|
|
|
ER
|
10
|
10
|
|
--
|
|
04 in Feb 22+04 in Feb 22 +02 in Mar’22
|
ECR
|
12
|
12
|
|
--
|
|
03 in Feb22+05 in Mar’22+04 in Aug’22
|
ECoR
|
11
|
|
|
11
|
|
|
NR
|
16
|
02
|
|
14
|
|
02 in Mar’23(TKD)
|
NCR
|
10
|
06
|
|
04
|
|
01 in Feb22+01 in Mar’22+04 in Mar’23(CNB)
|
SR
|
10
|
|
04
|
06
|
|
04 in May 23(ED)
|
SCR
|
15
|
02
|
|
13
|
|
02 in APR’22
|
SER
|
16
|
16
|
|
--
|
|
01 in Feb22+04 in Feb22+05 in Feb 22+03 in Mar’22+03 in MAY’22
|
SECR
|
11
|
11
|
|
--
|
|
+07 in Mar’22+04 in Mar’22
|
WR
|
11
|
09
|
|
02
|
|
02 in FEB’22+02 in Feb 22+02 in Mar’22(BRCY against GD/NER)+ 03 in Aug’22
|
WCR
|
16
|
|
|
16
|
|
|
3.
|
PB no. 1245/22-23,288/23-24
(New Acquisition 22-23
(Allotted Vide Rly.Bd L/No- 2022/Elect.(TRS)/441/1 dt 06.04.22)
Total Qty – 75 NOS.
|
CR
|
05
|
|
|
05
|
|
|
ER
|
08
|
02
|
|
06
|
|
02 in JULY ‘22
|
ECR
|
05
|
|
|
05
|
|
|
ECoR
|
05
|
|
|
05
|
|
|
NR
|
04
|
|
|
04
|
|
|
NCR
|
04
|
|
|
04
|
|
|
NER
|
06
|
|
|
06
|
|
|
NFR
|
06
|
02
|
02
|
02
|
|
02 in Mar’23(MLDT)+02 in May’23(MLDT)
|
SR
|
03
|
|
|
03
|
|
|
SCR
|
04
|
|
|
04
|
|
|
SER
|
05
|
03
|
02
|
00
|
|
+03 IN FEB’23(ROU)+02 in May’23(ROU)
|
SWR
|
06
|
06
|
|
--
|
|
02 in June’22+(02+02)04 in NOV’22
|
SECR
|
05
|
|
|
05
|
|
|
WR
|
04
|
|
02
|
02
|
|
02 in JUN 23(BL)
|
WCR
|
05
|
|
|
05
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
325
|
171
|
10
|
144
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
Grand Total
|
|
325
|
171
|
10
|
144
|
|
|
Bogie with Brake Rigging WAP-5 ( Qty in Nos , i.e 2 Nos=1L/set)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 246/12-13(B),39/13-14(B),122/15-16(B) 104/16-17(B) , 83/17-18(B) ,63/18-19(B) , 52/19-20(B), 52/20-21(B), 36/21-22(B),22/22-23(B),19/23-24(B)
(Vide R.B. L/N.- 2012/Elect.(TRS)/441/1 dt.- 29.05.2012)
|
NR /
|
01
|
01
|
|
-
|
|
Fully Supplied With Disc Brake Mar’2018
|
WR / BRCY
|
01
|
|
|
01
|
Vide CEE/WR/HQ’s L/N.- EL 91/39/1 dt.- 09.01.15
|
|
-
|
P.B.No.- 216/14-15(B),149/15-16(B) 130/16-17(B) , 109/17-18(B) , 85/18-19(B) , 72/19-20(B), 72/20-21(B), 51/21-22(B),31/22-23(B),25/23-24(B)
(with disc brake)(Vide RB L/N.- 2014/Elect(TRS)/441/2 dt.- 06.08.2014)
|
WR / BRCY
|
02
|
|
|
02
|
Vide CEE/WR/HQ’s L/N.- EL 91/39/1 dt.- 09.01.15
|
|
|
Total against Board’s RSP
|
|
04
|
01
|
|
03
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
04
|
01
|
|
03
|
|
|
Bogie Frame WAG-9/WAP-7 ( Qty in Nos , i.e 2 Nos=1L/set)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 178/09-10(B),134/10-11(B),150/11-12(B), 158/12-13(B),129/13-14(B),137/14-15(B),84/15-16(B), 73/16-17(B) ,55/17-18(B) , 40/18-19(B) , 33/19-20(B), 33/20-21(B), 21/21-22(B),16/22-23(B),14/23-24(B)
(Replacement Bogie)
(Vide RB’s L/N.- 2009/Elect.(TRS)/441/3 dt.- 07.08.2009)
|
CR / KYN/AQ
|
02
|
02
|
|
-
|
|
Fully Supplied On May’17
|
ECR /
|
02*
|
-
|
|
02*
|
|
Not Required As Per Dy.Cee(L)/Ecr’s L/N.-Ecr/ Ele/Rs/303/198 Dt.-24.01.2013
|
NR / GZB
|
04
|
04
|
|
-
|
|
Fully Supplied As Per P.B. Demand (Wap-7)
|
SCR/LGD
|
04
|
04
|
|
-
|
|
01no Supplied On May’17+02no Supplied On June’17+01 No Supplied In Sep17
|
SECR /BIA
|
04
|
04
|
|
-
|
|
01 Set (2nos) Supplied In May’17+01 Set (2nos) Supplied In June’17
|
WCR /
|
04
|
04
|
|
-
|
|
01 Set (2nos) Supplied In April17+01l/S In May18 With Brk
|
Against Requisition / Indents
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
20
|
18
|
|
02
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
20
|
18
|
|
02
|
|
|
Bogie with Brake Rigging WAG-9/WAP-7 ( Qty in Nos , i.e 2 Nos=1L/set)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 215/14-15(B),148/15-16(B) , 129/16-17(B) ,108/17-18(B) ,84/18-19(B) , 71/19-20(B), 71/20-21(B), 50/21-22(B),30/22-23(B),24/23-24(B)
(Vide RB L/N.- 2014/Elect(TRS)/441/2 dt.- 06.08.2014)
|
CR /
|
01
|
02
|
|
-
|
|
02 Nos Supplied In Nov2017 ( 01 Nos Excess Supply ) , Brake Due
|
ECoR /
|
01
|
02
|
|
-
|
|
01 Set (2nos) Supplied In June’17 ( Brk Riging Due), 01 Bogie Excess Supply.
|
ECR /GMO
|
01
|
01
|
|
-
|
|
Bogie With Brk Rigging In Mar’16
|
ER /
|
01
|
|
|
01
|
|
|
SCR /LGD
|
01
|
01
|
|
-
|
|
Fully Supplied With Brake Rigging In Sep17
|
SECR /
|
01
|
01
|
|
|
|
01no Supply June17, Brk Riging Due
|
SER /BNDM
|
01
|
01
|
|
|
|
01 Supplied In July18+Brk Rigg Supplied In 30.08.17
|
SR /
|
02
|
02
|
|
-
|
|
01 Set (2nos) Supplied In April17 ,Brk Riging Supplied In Oct’17
|
WCR /
|
01
|
01
|
|
--
|
|
Brk Riging Supplied In Nov2017+Bogie 1in JULY22(DD)
|
-
|
P.B.No.-172/18-19(B) , 92/19-20(B), 92/20-21 (B), 66/21-22(B), 41/22-23(B),35/23-24(B)
WAG-9 LOCO , QTY SANCTIONED IN LOCO SET
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 02.04.18)
Qty indicated in balance position is in Nos.
10L/S , i.e 10X2=20 Nos.
|
CR/
|
04
|
04
|
|
-
|
|
02 Bogie In Feb19 , Brk Due +02 in Aug19 , Brk Due .
|
ECR/
|
04
|
04
|
|
--
|
|
01 L/S Brake supply in June 19+01 L/S Bogie In Nov19+01 L/S Brake supply in Oct’20+Bogie 02 in JULY22(DD)
|
ECOR/
|
04
|
04
|
|
-
|
|
02 L/S Supplied In June18 , 02 sets IN JUNE 23 (VSKP)Brk .
|
NR/
|
04
|
04
|
|
-
|
|
01 l/Set In April19(Brk Due)+02 IN JULY19+Brk. 02 in May ‘23(GZB)
|
NCR/
|
04
|
04
|
|
-
|
|
02 Nos in May19(Brk Due ) +02 Nos in June 19(Brk Due )
|
-
|
PB no. 176/20-21(B), 77/21-22(B), 51/22-23(B), 43/23-24(B)
for WAG-9 LOCO ,
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty - ( 10 L/sets = 20 nos)
|
CR
|
02
|
02
|
|
--
|
|
+Bogie 02+ BR 02 in JULY22(DD)
|
ECR
|
02
|
01
|
|
01
|
|
+Bogie 01 in JULY22(DD)+BR 02 in JULY22(DD)
|
ECoR
|
04
|
03
|
|
01
|
|
Bogie 03+BR 03 in JULY22(DD)
|
NR
|
02
|
02
|
|
--
|
|
Bogie 02)+BR 01 in JULY22(DD)
|
NCR
|
02
|
|
|
02
|
|
|
SCR
|
02
|
02
|
|
--
|
|
01 L/s Brake in OCT20 (LGD), bogie due)+02 Bogie in JULY 22 (DD)
|
SER
|
02
|
02
|
|
--
|
|
Full in JULY22(DD)
|
SECR
|
02
|
02
|
|
--
|
|
01 L/s in MAR 21 (BIA) + BR 02 in JULY22(DD)
|
WCR
|
02
|
02
|
|
--
|
|
Full in JULY22(DD)
|
4.
|
PB no. 177/20-21(B), 78/21-22(B), 52/22-23(B), 44/23-24(B)
for
WAP-7 LOCO.
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty - ( 10 L/sets = 20 nos)
|
CR
|
02
|
01
|
|
01
|
|
Bogie 01 in JULY22(DD) 01 break DUE
|
ECR
|
02
|
01
|
|
01
|
|
Bogie 01+ BR 01 in JULY22(DD)
|
NR
|
02
|
01
|
|
01
|
|
01 Bogie in JULY22(DD Brk. 01 in May ‘23(GZB)
|
SR
|
02
|
02
|
|
--
|
|
01 L/s in APR 21 (ED) (Brk. Due)
|
SCR
|
02
|
02
|
|
-
|
|
Bogie 01+ BR 02 in JULY22(DD))+01 bogie IN FEB’23(LGD)
|
SER
|
02
|
|
|
02
|
|
|
SECR
|
02
|
02
|
|
--
|
|
01L/s in Aug 21(Brk. Due)
|
WR
|
02
|
01
|
|
01
|
|
Bogie 01+ BR 02 in JULY22(DD)01 bogie DUE
|
WCR
|
04
|
02
|
|
02
|
|
02 Bogie+01BR in JULY22(DD)( 01Break DUE)
|
5.
|
PB no. 155/21-22(B) , 57/22-23(B),49/23-24(B)
for WAG-9 LOCO ,
(New Acquisition 2021-22)
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
Total Qty - ( 10 L/sets = 20 nos)
|
CR
|
02
|
|
|
02
|
|
|
ECR
|
02
|
|
|
02
|
|
|
ECoR
|
02
|
|
|
02
|
|
|
NR
|
02
|
|
|
02
|
|
|
NCR
|
02
|
|
|
02
|
|
|
SCR
|
02
|
02
|
|
-
|
|
02 BOGIE +BK IN FEB’23(LGD)
|
SER
|
02
|
|
|
02
|
|
|
SECR
|
02
|
02
|
|
00
|
|
01L/s in Aug 21(Brk. Due)
|
WCR
|
02
|
|
|
02
|
|
|
SWR
|
02
|
01
|
|
01
|
|
Bogie 01 in JULY22(DD) Break 01 DUE
|
Against Requisition / Indents/PO
|
|
|
|
|
|
|
|
6.
|
PO/NO – 02167019701011 DT 03.10.2017
L/NO- ECoR/ELS/471/08/2228 DT 09.10.2017
(15 LOCO SETS )
Qty indicated in balance position is in Nos.
15L/S , i.e 15X2=30 Nos.
|
CR/AQ
|
02
|
02
|
|
-
|
|
02 In Dec18,Brk Due.
|
CR/KYN
|
02
|
|
|
02
|
|
|
ECR/GOMOH
|
04
|
|
|
04
|
|
|
ECOR/VSKP
|
04
|
04
|
|
-
|
|
04 In Sep18 Brk Due
|
NR/LDH
|
02
|
02
|
|
-
|
|
02 IN JULY 19
|
NCR/CNB
|
02
|
02
|
|
-
|
|
02 Nos Supplied In Dec17 , Brk Due
|
SCR/KZJ
|
04
|
04
|
|
-
|
|
04 Bogie Supplied June18, Brk 04 NOS IN FEB’23(KZJ)
|
SER/TATA
|
02
|
02
|
|
-
|
|
Brk Rigg Due, Bogie Supply 01L/S MAY18
|
SECR/BIA
|
02
|
|
|
02
|
|
|
WR/BRCY
|
02
|
02
|
|
-
|
|
02 In Aug18 ,Brake Supplied
|
WCR/TKD
|
04
|
04
|
|
-
|
|
04 In Aug18 , 02 nos Brk supplied on SEP 20, 02 nos Brk. Due
|
Total against Board’s RSP
|
|
90
|
64
|
|
26
|
|
01 Bogie Excess Supply Ecor+01 Bogie Excess Supply Cr/Aq
|
Total Against Requisition
|
|
30
|
22
|
|
08
|
|
|
Grand Total
|
|
120
|
86
|
|
34
|
|
01 Bogie Excess Supply Ecor+01 Bogie Excess Supply Cr/Aq, Total 02 Nos Bogie Excess Supply
|
Wheel Set WAG-9 ( QTY IN NOS)
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
-
|
P.B.No.- 614/05-06,86/13-14(B),41/15-16(B) , 32/16-17(B) , 26/17-18(B) , 16/18-19(B) , 12/19-20(B), 12/20-21(B), 07/21-22(B), 06/22-23(B),06/23-24(B)
|
CR /
|
10
|
06
|
|
04
|
|
06 Set Supplied In Sep17
|
-
|
P.B.No.- 667/06-07,88/07-08(B),17/08-09(B),
17/09-10(B),17/10-11(B),29/11-12(B),38/12-13(B), 52/13-14(B),58/14-15(B),52/15-16(B), 41/16-17(B) , 31/17-18(B) ,21/18-19(B) , 17/19-20(B), 17/20-21(B), 11/21-22(B) 08/22-23(B),07/23-24(B)
Vide Rly Bd. L/No- 2006/ Elect.(TRS)/441/3 DT 03.04.2006
|
CR /
|
03
|
03
|
|
-
|
|
03 In Aug18
|
ECR /
|
04
|
04
|
|
-
|
|
Fully Supplied As Per P.B. Demand Aug’2009
|
NR /
|
03
|
|
|
03
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
-
|
12/694/25 Pt 1 , 66874088 DT 15.02.19
|
NKJ/WCR
|
03
|
01
|
|
02
|
|
01 IN JULY19
|
|
Total against Board’s RSP
|
|
20
|
13
|
|
07
|
|
|
|
Total Against Requisition
|
|
03
|
01
|
|
02
|
|
|
|
Grand Total
|
|
23
|
14
|
|
09
|
|
|
Wheel Set WAP-7 ( QTY IN NOS)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Requisition / Indents
|
1
|
WO – 12/682/25 PT 1
|
WCR/ET
|
06
|
|
|
06
|
|
|
2
|
WO – 12/713/11 PT 1 25.02.20
|
SR/ED
|
04
|
|
|
04
|
|
|
|
Total against Board’s RSP
|
|
|
|
|
-
|
|
|
|
Total Against Requisition
|
|
10
|
|
|
10
|
|
|
|
Grand Total
|
|
10
|
|
|
10
|
|
|
Wheel Set WAP-5 ( QTY IN NOS)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
1.
|
P.B.No.- 1180/18-19,387/19-20, 386/20-21,
302/21-22, 270/22-23,162/23-24
|
NR/GZB
|
05
|
04
|
|
01
|
|
04 Set In Nov18
|
Against Requisition / Indents
|
2.
|
Req.No : 121046830 DT 02.06.2018
|
NR/GZB
|
02
|
|
|
02
|
|
W.O.NO – 12/657/09 Pt III Dt 21.08.18
|
|
Total against Board’s RSP
|
|
05
|
04
|
-
|
01
|
|
|
|
Total Against Requisition
|
|
02
|
|
|
02
|
|
|
|
Grand Total
|
|
07
|
04
|
|
03
|
|
|
Transformer for 6531 KVA WAG-9 (3-Phase) ( QTY IN LOCO SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.-1183/18-19, 390/19-20, 389/20-21,
304/21-22, 212/22-23,164/23-24
Total Qty - (06 nos)
|
CR/
|
01
|
01
|
|
--
|
|
01 in JULY ‘22(DD)KYN
|
ECR/
|
01
|
01
|
|
-
|
|
01 In Aug18
|
ECOR/
|
01
|
01
|
|
-
|
|
01 Supplied In July18
|
NCR/
|
01
|
01
|
|
--
|
|
+01 IN SEPT’22(DD)
|
SER/
|
01
|
01
|
|
-
|
|
01 Set Supplied In June18
|
WCR/NKJ
|
01
|
01
|
|
-
|
|
|
-
|
PB. No. 1167/ 19-20, 412/20-21, 327/21-22, 231/22-23 ,182/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
Total Qty - (10 nos)
|
CR
|
01
|
01
|
|
--
|
|
01 in JULY ‘22(DD)BSL
|
ECR
|
01
|
01
|
|
--
|
|
01 in Sept’21
|
ECoR
|
01
|
01
|
|
--
|
|
01 in Aug’22(DD)
|
NR
|
01
|
01
|
|
--
|
|
01 in Aug’22(DD)
|
NCR
|
01
|
01
|
|
--
|
|
01 in JULY ‘22(DD)
|
SCR
|
01
|
01
|
|
--
|
|
01 in Aug 21
|
SER
|
01
|
01
|
|
--
|
|
01 IN JULY 21
|
SECR
|
01
|
01
|
|
--
|
|
01 in JULY ‘22(DD)
|
WCR
|
02
|
02
|
|
--
|
|
02 in Aug’22(DD)
|
-
|
PB no. 1301/20-21, 380/21-22, 282/22-23,231/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty - (20 nos)
|
CR
|
03
|
03
|
|
--
|
|
`02 in Aug’22(DD)+01 in NOV’22(DD)
|
ECR
|
03
|
03
|
|
--
|
|
01 in JULY‘22(DD)+ 02 in Aug’22(DD)
|
ECoR
|
02
|
02
|
|
--
|
|
02 in Aug’22(DD)
|
NR
|
02
|
02
|
|
--
|
|
+01 IN SEPT’22(DD) 01 Adj from PB 255
|
NCR
|
01
|
01
|
|
--
|
|
01 in NOV’22(DD)
|
SCR
|
03
|
03
|
|
--
|
|
02 in Aug’22(DD) +01 IN SEPT’22(DD)
|
SER
|
03
|
03
|
|
--
|
|
03 in Aug’22(DD)
|
SECR
|
01
|
01
|
|
--
|
|
01 in Aug’22(DD)
|
WCR
|
02
|
02
|
|
--
|
|
01 in Aug’22(DD) +01 IN SEPT’22(DD)
|
4.
|
PB no. 1274/21-22, 306/22-23,255/23-24
(New Acquisition 2021-22)
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
Total Qty – 30 SETS.
|
CR
|
03
|
|
|
03
|
|
|
ER
|
02
|
02
|
|
--
|
|
01 IN JUNE’21(ASN)+ 01 IN JULY21
|
ECR
|
03
|
01
|
|
02
|
|
01 in Aug’22(DD)
|
ECoR
|
03
|
02
|
|
01
|
|
01 in Aug’22(DD)+01 in NOV’22(DD)
|
NR
|
03
|
01
|
|
02
|
|
+01 IN SEPT’22(DD)+01 in NOV’22(DD) Shifted 01to 231
|
NCR
|
02
|
|
|
02
|
|
|
SCR
|
03
|
03
|
|
--
|
|
+02 IN SEPT’22(DD) )+01 in NOV’22(DD)
|
SER
|
05
|
02
|
|
03
|
|
01 in Aug’22(DD)+01 in NOV’22(DD)
|
SWR
|
01
|
01
|
|
--
|
|
01 in Aug’22(DD)
|
SECR
|
02
|
01
|
|
01
|
|
+01 IN SEPT’22(DD)
|
WCR
|
03
|
01
|
|
02
|
|
+01 IN SEPT’22(DD)
|
5.
|
PB no. 1241/22-23,284/23-24
(New Acquisition 22-23
(Allotted Vide Rly.Bd L/No- 2022/Elect.(TRS)/441/1 dt 06.04.22)
Total Qty – 20/sets.
|
CR
|
01
|
01
|
|
--
|
|
+01 IN SEPT’22(DD)
|
ER
|
01
|
02
|
|
--
|
|
01 in Aug’22(DD) +01 IN SEPT’22(DD) EXTRA
|
ECR
|
02
|
|
|
02
|
|
|
ECoR
|
02
|
|
|
02
|
|
|
NR
|
02
|
|
|
02
|
|
|
NCR
|
01
|
|
|
01
|
|
|
NER
|
01
|
|
|
01
|
|
|
NFR
|
01
|
|
|
01
|
|
|
SCR
|
02
|
|
|
02
|
|
|
SER
|
02
|
|
|
02
|
|
|
SWR
|
01
|
|
|
01
|
|
|
SECR
|
02
|
|
|
02
|
|
|
WR
|
01
|
|
|
01
|
|
|
WCR
|
01
|
|
|
01
|
|
|
Against Requisition / Indents
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
86
|
53
|
|
33
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
86
|
53
|
|
33
|
|
|
Transformer 7775 KVA for WAP-5/WAP-7 (3-Phase) ( QTY IN LOCO SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No – 1204/17-18 ,359/18-19 , 346/19-20, 346/20-21
272/21-22, 184/22-23,138/23-24
|
CR/AQ
|
02
|
02
|
|
-
|
|
01no Supply In July’17+01 Set Supplied In Sep’17
|
ER/HWH
|
02
|
02
|
|
-
|
|
01 Set Supplied In May’17+01set Supply In Oct’17
|
NR/GZB
|
03
|
03
|
|
--
|
|
01no Supply In Nov’17+01no Supply In Feb18+01 IN Aug 21
|
SR/RPM
|
02
|
02
|
|
-
|
|
01 Set Supplied In June’17+01 Set Supplied In Sep’17
|
SCR/LGD
|
01
|
01
|
|
-
|
|
01set Supplied In Nov2017.
|
SER/
|
01
|
01
|
|
-
|
|
Supllied In 15.01.2018
|
WR/BRCY
|
03
|
03
|
|
--
|
|
01 In Nov18+01 In Dec18+01 in JUYL22(DD)
|
WCR/
|
01
|
01
|
|
-
|
|
01set Supplied As Per P.B. Demand Jan’18
|
-
|
P.B.No.-1182/18-19 , 389/19-20 , 388/20-21,
303/21-22, 211/22-23,163/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 02.04.18)
(Re -Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/462/1 dt 29.01.19 )
|
ECOR/
|
01
|
01
|
|
-
|
|
01 Supplied In July18
|
NR/
|
01
|
01
|
|
--
|
|
+01 in JUYL22(DD)
|
ECR/
|
01
|
01
|
|
-
|
|
01 In Feb19
|
SR/
|
01
|
01
|
|
-
|
|
Fully Supplied In Nov’18
|
SCR/
|
01
|
02
|
|
-01
|
|
01 In Aug18.EXCESS SUP. 01 NO IN NOV’22(DD)(LGD)
|
SER/
|
01
|
01
|
|
-
|
|
01 Set Supplied In June18
|
SECR/
|
01
|
01
|
|
-
|
|
01 Set Supplied In June18
|
WR/
|
01
|
|
|
01
|
|
|
3
|
PB no. 1300/20-21, 379/21-22, 281/22-23, 230/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty - (20 nos)
|
CR
|
02
|
02
|
|
--
|
|
02in MAR 21 (AQ)
|
ER
|
01
|
01
|
|
--
|
|
01in MAR 21 (KPA)
|
ECR
|
02
|
02
|
|
--
|
|
01 in Sep,21+01 in JUYL22(DD)
|
ECoR
|
01
|
01
|
|
--
|
|
01in MAR 21 (VSKP)
|
NR
|
03
|
02
|
|
01
|
|
+02 IN SEPT’22(DD)
|
NCR
|
01
|
01
|
|
--
|
|
01in JAN21
|
SR
|
01
|
01
|
|
--
|
|
01in MAR 21 (ED)
|
SCR
|
02
|
02
|
|
--
|
|
02 IN APRIL21 (LGD)
|
SER
|
03
|
03
|
|
--
|
|
01in Sep20(TATA)+ 01in MAR 21 (BNDM) +01in MAR 21 (SRC)
|
SECR
|
01
|
01
|
|
--
|
|
01in MAR 21 (BIA)
|
WR
|
01
|
|
|
01
|
|
|
WCR
|
02
|
04
|
|
-02
|
|
01 IN JULY 21+01 IN Aug 21+Excess sup 02 in JULY ‘22(DD) (ET-01,TKD-01)
|
Against Requisition / Indents
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
43
|
43
|
|
--
|
|
Excess sup 02 in JULY ‘22(DD) (ET-01,TKD-01)+ 01 NO IN NOV’22(DD)(LGD)
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
43
|
43
|
|
--
|
|
|
Primary Voltage Transformer (3-Phase) ( QTY IN NOS )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.-177/18-19 (B) , 97/19-20(B), 97/20-21(B), 71/21-22(B), 45/22-23(B),37/23-24(B)
Qty in Nos.
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 02.04.18)
|
CR/
|
02
|
02
|
|
-
|
|
02 Insep18
|
ER/HWH
|
01
|
01
|
|
-
|
|
01 Supplied In July18
|
ECR/
|
02
|
02
|
|
-
|
|
02 Supply in 02 Aug19
|
ECOR/
|
01
|
01
|
|
-
|
|
01 Insep18
|
NR/GZB
|
04
|
04
|
|
-
|
|
02 Supply In June18+01 In Oct18+01 IN NOV19
|
NCR/
|
01
|
01
|
|
-
|
|
01 in July19
|
SR/
|
01
|
01
|
|
-
|
|
01 IN SEP19
|
SCR/
|
02
|
02
|
|
-
|
|
01 In Aug18+01 IN NOV19
|
SER/SRC
|
02
|
02
|
|
--
|
|
01 IN OCT19 01 Adj from PB 39
|
SECR/
|
01
|
01
|
|
-
|
|
01 In Nov18
|
WR/
|
03
|
03
|
|
--
|
|
02 In Dec18 +01 IN JULY20
|
-
|
PB no. 169/19-20 (B ), 99/20-21(B), 73/21-22(B), 47/22-23(B),39/23-24(B)
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
06
|
05
|
|
01
|
|
02 IN DEC19 + 02 IN JAN20(AJNI)+01 IN FEB’23(DD)
|
ECR
|
06
|
03
|
|
03
|
|
01 in FEB21+01 in FEB’22+01 in MAY’22
|
NR
|
06
|
06
|
|
--
|
|
02 IN SEP19/LDH +02 IN JAN20(GZB)+02 IN SEPT’22
|
SCR
|
06
|
05
|
|
01
|
|
01 IN NOV19 +01 IN AUG20 (KZJ) 03 in Mar’23(KZJ)
|
SER
|
06
|
01
|
|
05
|
|
01 IN SEP19/BKSC+ 01 in Mar’22( 01 Shifted to PB 37)
|
SECR
|
04
|
04
|
|
-
|
|
04 IN FEB20
|
WCR
|
06
|
|
|
06
|
|
|
-
|
PB no. 175/20-21(B), 76/21-22(B), 50/22-23(B)
42/23-24(B)
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty = 20 nos.
|
CR
|
03
|
|
|
03
|
|
|
ECR
|
03
|
|
|
03
|
|
|
NR
|
03
|
|
|
03
|
|
|
SCR
|
03
|
|
|
03
|
|
|
SER
|
03
|
|
|
03
|
|
|
SECR
|
02
|
02
|
|
--
|
|
01in MAR 21 (BIA)+01 in June’22
|
WCR
|
03
|
|
|
03
|
|
|
Against Requisition / Indents
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
80
|
46
|
|
34
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
80
|
46
|
|
34
|
|
|
Vehicle Control Unit (3-Phase) ( QTY IN LOCO SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
1.
|
P.B.No.- 1208/17-18 , 363/18-19 , 350/19-20, 350/20-21,
274/21-22, 186/22-23,140/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 05.04.17)
|
CR/
|
06
|
06
|
|
|
|
02 Set Supplied In June2018+02in Sep18+02 In Dec18
|
ER/HWH
|
02
|
02
|
|
|
|
02set Supplied As Per P.B. Demand Jan’18
|
ECR/GOMOH
|
06
|
05
|
|
01
|
|
03 L/S Supplied In Oct’17+01 In Nov18+01in Dec18
|
ECOR/
|
04
|
04
|
|
|
|
03in Sep18+01 In Feb19
|
NR/
|
08
|
03
|
|
05
|
|
02 Set Supplied In June2018+01 In Dec18
|
SR/
|
04
|
04
|
|
|
|
02set Supply In May2018+02 In Aug18
|
SCR/KZJ/LGD
|
04
|
04
|
|
|
|
01 Supplied In July18+03 Supplied In July18
|
SER/
|
04
|
04
|
|
|
|
02set Supply In May2018+ 02 Set Supplied In June2018
|
SECR/
|
02
|
|
|
02
|
|
|
WR/
|
04
|
04
|
|
|
|
02 Nos Supplied In March18+01 Supplied In July18+01 in NOV19
|
WCR/
|
06
|
06
|
|
|
|
05 Nos Supplied In Nov2017+01no In June18
|
2.
|
P.B.No.-1176/18-19 , 383/19-20, 382/20-21,
298/21-22, 207/22-23,159/23-24
|
CR/
|
06
|
04
|
|
02
|
|
01 In Oct18+02 In Dec18+01 In Jan19
|
ER/
|
01
|
01
|
|
|
|
01 Set In Aug18
|
ECR/
|
06
|
02
|
|
04
|
|
02 In Feb19
|
ECOR/
|
01
|
|
|
01
|
|
|
NR/
|
12
|
|
|
12
|
|
|
SR/
|
03
|
02
|
|
01
|
|
02 In Jan19
|
SCR/LGD
|
06
|
05
|
|
01
|
|
01 Supplied In July18+01 To Kzj In Aug18+01 To Lgd Aug18 + 02 IN JAN 20
|
SER/
|
03
|
02
|
|
01
|
|
02 Set Supplied In June2018(BNDM)
|
SECR/
|
03
|
01
|
|
02
|
|
01 Set In Aug18
|
WR/
|
04
|
03
|
|
01
|
|
01 In Dec18+02 In Feb19
|
WCR/
|
05
|
03
|
|
02
|
|
01 Supplied In July18+02 In Aug18
|
3.
|
PB no.1183/ 19-20, 428/20-21, 343/21-22, 247/22-23,197/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
09
|
|
|
09
|
|
|
ER
|
08
|
|
|
08
|
|
|
ECR
|
08
|
|
|
08
|
|
|
ECo
|
08
|
|
|
08
|
|
|
NR
|
09
|
|
|
09
|
|
|
NCR
|
08
|
|
|
08
|
|
|
SR
|
08
|
|
|
08
|
|
|
SCR
|
09
|
02
|
|
07
|
|
02 IN JAN20
|
SER
|
08
|
|
|
08
|
|
|
SECR
|
08
|
|
|
08
|
|
|
WR
|
08
|
|
|
08
|
|
|
WCR
|
09
|
|
|
09
|
|
|
4.
|
PB no. 1294/20-21, 373/21-22, 275/22-23,224/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 100 sets
|
CR
|
09
|
|
|
09
|
|
|
ER
|
08
|
|
|
08
|
|
|
ECR
|
09
|
|
|
09
|
|
|
Eco
|
08
|
|
|
08
|
|
|
NR
|
09
|
|
|
09
|
|
|
NCR
|
08
|
|
|
08
|
|
|
SR
|
07
|
|
|
07
|
|
|
SCR
|
09
|
|
|
09
|
|
|
SER
|
08
|
|
|
08
|
|
|
SECR
|
08
|
|
|
08
|
|
|
WR
|
08
|
|
|
08
|
|
|
WCR
|
09
|
|
|
09
|
|
|
5.
|
PB no. 1244/22-23,287/23-24
(New Acquisition 22-23
(Allotted Vide Rly.Bd L/No- 2022/Elect.(TRS)/441/1 dt 06.04.22)
Total Qty – 10 L sets.
|
ECR
|
02
|
|
|
02
|
|
|
NER
|
02
|
|
|
02
|
|
|
NFR
|
02
|
|
|
02
|
|
|
SWR
|
04
|
|
|
04
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
310
|
67
|
|
243
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
310
|
67
|
|
243
|
|
|
Auxiliary Converter (3-Phase) ( QTY IN LOCO SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 1052/11-12,325/14-15,299/15-16, 253/16-17,253/17-18, 201/18-19 , 194/19-20, 194/20-21
148/21-22, 101/22-23 ,69/23-24
(Retrofitment IGBT based)(Vide RB’s L/N- 2011/Elect.(TRS)/441/2 dt.- 11.05.2011)
|
CR /
|
10
|
08
|
02
|
--
|
|
01 Set Supplied In 27.01.2017
01 Set Supplied In 22.02.2017
01 Set Supplied In 13.09.2017
01 Set Supplied In May2018(Kyn)
02 Set Supplied In June2018(Aq)
02 Set Supplied In Aug18(Kyn)+
02 inAug23(AQ)DD
|
-
|
P.B.No.- 1207/17-18, 362/18-19 , 349/19-20, 349/20-21
273/21-22,185/22-23,139/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 05.04.17)
|
CR/
|
01
|
|
01
|
--
|
|
01 inAug23(AQ)DD
|
ECOR
|
01
|
01
|
|
-
|
|
Fully Supplied As Per P.B. Demand Sep17
|
NR/
|
01
|
01
|
|
-
|
|
01 Set In Oct18
|
SR/
|
01
|
01
|
|
-
|
|
Fully Supplied As Per P.B. Demand June’17
|
SCR/
|
02
|
02
|
|
-
|
|
02 Set Supplied As Per P.B. Demand June’18
|
SER/
|
01
|
01
|
|
-
|
|
Fully Supplied As Per P.B. Demand Aug’17
|
SECR/BIA
|
01
|
01
|
|
-
|
|
Fully Supplied As Per P.B. Demand June’18
|
WR/
|
01
|
01
|
|
-
|
|
01 Supplied In July18
|
WCR/TKD
|
01
|
01
|
|
-
|
|
Fully Supplied As Per P.B. Demand Feb’18
|
-
|
P.B.No.-1177/18-19 , 384/19-20, 383/20-21
299/21-22, 208/22-23,160/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 02.04.18)
|
CR/KYN
|
02
|
01
|
01
|
--
|
|
01 In Nov18 +01 in Aug 23(KYN)DD
|
ER/
|
01
|
|
01
|
--
|
|
01 in JULY 23 (HWH) DD
|
ECR/GOMO
|
02
|
02
|
|
-
|
|
02 Supplied In July18
|
ECOR/
|
01
|
01
|
|
-
|
|
01 Set In Au18
|
NR/
|
01
|
01
|
|
-
|
|
01 In Dec18
|
SER/
|
02
|
02
|
|
-
|
|
01 Set Supplied As Per P.B. Demand June’18+01 Set In Aug18
|
SECR/
|
01
|
01
|
|
-
|
|
01 In Aug18
|
-
|
PB no. 1295/20-21, 374/21-22, 276/22-23,225/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 15 sets.
|
CR
|
02
|
|
02
|
--
|
|
01 inAug23(KYN)DD+ 01 inAug23(AQ)DD
|
ER
|
01
|
|
|
01
|
|
|
ECR
|
01
|
|
|
01
|
|
|
ECoR
|
01
|
|
|
01
|
|
|
NR
|
02
|
|
|
02
|
|
|
NCR
|
01
|
|
|
01
|
|
|
SR
|
01
|
|
01
|
--
|
|
01 inAug23(RPM)DD
|
SCR
|
01
|
|
01
|
--
|
|
01 inAug23(LGD)DD
|
SER
|
02
|
|
02
|
--
|
|
02 inAug23(TATA)DD
|
SECR
|
01
|
|
01
|
--
|
|
01 inAug23(BSP)DD
|
WCR
|
02
|
|
01
|
01
|
|
01 in JULY 23 (TKD) DD
|
5
|
PB no. 1265/21-22, 297/22-23,246/23-24
(New Acquisition 2021-22)
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
Total Qty – 35 L/sets.
|
CR
|
03
|
|
|
03
|
|
|
ER
|
03
|
|
|
03
|
|
|
ECR
|
03
|
|
|
03
|
|
|
ECoR
|
03
|
|
|
03
|
|
|
NR
|
05
|
|
02
|
03
|
|
02 in JULY 23 (GZB) DD
|
NCR
|
02
|
|
01
|
01
|
|
01 in JULY 23 (CNB) DD
|
SR
|
02
|
|
|
02
|
|
|
SCR
|
04
|
|
|
04
|
|
|
SER
|
05
|
|
01
|
04
|
|
01 inAug23(TATA)DD
|
SECR
|
01
|
|
|
01
|
|
|
WCR
|
02
|
|
02
|
--
|
|
02 in JULY 23 (TKD-1,NKJ-1) DD
|
WR
|
01
|
|
01
|
--
|
|
01 inAug23(BRCY)DD
|
SWR
|
01
|
|
01
|
--
|
|
01 inAug23(KJM)DD
|
Against Requisition
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
80
|
25
|
21
|
34
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
80
|
25
|
21
|
34
|
|
|
Propulsion Equipment IGBT based ( Qty in Loco Set ) (3-Phase)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.-1172/18-19 , 379/19-20, 378/20-21,
295/21-22, 205/22-23,158/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 02.04.18)
(Revised distribution CEE/D&D L/NO EL/L/110/CSP TO BD DT 21.06.18
(Re -Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/462/1 dt 12.11.18)
(Re -Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/462/1 dt 29.01.19)
|
CR/AQ
|
05
|
05
|
|
-
|
|
02 Supplied In July18+03 Supply In Dec18
|
ER/HWH
|
01
|
01
|
|
-
|
|
01 Supplied In July18
|
ECR/
|
14
|
14
|
|
-
|
|
02 Set In Oct18+01 In Dec18+03 In Jan19+03 In Feb19+05 In Mar19
|
NR/GZB
|
14
|
14
|
|
--
|
|
01 Set Supplied In June2018+01 Supplied In July18+02 InAug18+02insep18+01 In Dec18+02 In Jan19+02 In Mar19+01 in April’19+01 IN NOV19+01 in DEC19
|
SR/
|
01
|
01
|
|
-
|
|
02 In Aug. (01 Excess Supply)
|
SCR/
|
04
|
04
|
|
-
|
|
02 Supplied In July18+02 In Aug18
|
SER/
|
04
|
04
|
|
-
|
|
01 Set Supplied In June2018+01set In Sep18+01insep18+01 In Dec18
|
SECR/
|
02
|
02
|
|
-
|
|
01 In Aug18+01 In Mar19
|
WR/BRCY
|
02
|
02
|
|
-
|
|
01 In Nov18 , 01 IN OCT19
|
WCR/TKD
|
03
|
03
|
|
-
|
|
01 Set Supplied In June2018+01 Supplied In July18+01 In Aug18 + 01 In Mar19 ( One Excess Supply )
|
-
|
PB no. 1179/ 19-20, 424/20-21, 339/21-22, 243/22-23,
193/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
15
|
05
|
|
10
|
|
01 IN NOV19+01 in DEC19+01 in OCT20+01 in NOV20+01 in JAN21
|
ER
|
05
|
03
|
|
02
|
|
01 IN AUG20(KPA) +01 in NOV20 +01 IN DEC20(KPA)
|
ECR
|
10
|
05
|
|
05
|
|
01 in OCT19+01 IN NOV19 +01 IN JUNE 20 + 01 IN AUG20+01 in OCT20
|
NR
|
20
|
02
|
|
18
|
|
01 IN SEP2019/GZB+01IN OCT19+
|
SR
|
10
|
07
|
|
03
|
|
01 SET Adjusted against 2018-19 supply, 01 IN SEP19+01 IN NOV19+01 in DEC19+01 in NOV20 +02 IN DEC20(RPM)
|
SCR
|
15
|
09
|
|
06
|
|
03 IN SEP2019/LGD+01 IN NOV19+01 in DEC19 +01 IN AUG20 (KZJ) + 03 in OCT20 (LGD)
|
SER/TATA
|
05
|
05
|
|
-
|
|
02 Set Supply in Sep19./TATA+01 in OCT19/ROU+01 IN NOV19+01 IN SEP20 (ROU)
|
SECR
|
10
|
03
|
|
07
|
|
01IN OCT19+01 IN NOV19+01 IN June’20
|
WR
|
05
|
01
|
|
04
|
|
01 in Sep 20 (BRCY)
|
WCR/TKD
|
05
|
05
|
|
--
|
|
01 SET Adjusted against 2018-19 supply+01 SET ON 12.09.19/TKD+01 IN NOV19+ 01 in Sep 20 (TKD) + 01 in Oct 20 (TKD)
|
-
|
PB No. 1222/23-24
NEW ALLOCATION
TOTAL 200 SETS
(Allotted Vide Rly.Bd L/No- 2023/Elect.(TRS)/441/1 dt 11.04.2023)
|
CR
|
40
|
|
|
40
|
|
|
ER
|
07
|
|
|
07
|
|
|
ECR
|
25
|
|
|
25
|
|
|
NR
|
20
|
|
|
20
|
|
|
NCR
|
02
|
|
|
02
|
|
|
NFR
|
01
|
|
|
01
|
|
|
SR
|
07
|
|
|
07
|
|
|
SCR
|
28
|
|
|
28
|
|
|
SER
|
15
|
|
|
15
|
|
|
SECR
|
17
|
|
|
17
|
|
|
WR
|
17
|
|
|
17
|
|
|
WCR
|
21
|
|
|
21
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
350
|
95
|
|
255
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
350
|
95
|
|
255
|
|
|
IGBT BASED TRACTION CONVERTER for 3-phase locos ( Qty in Loco Set ) (3-Phase)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 23-24
|
Remarks
|
1.
|
PB no. 1296/20-21, 375/21-22, 277/22-23,266/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 15 sets.
|
CR
|
02
|
02
|
|
-
|
|
01 in OCT’20)+ 01 in Mar’23(AQ)DD
|
ECR
|
02
|
02
|
|
--
|
|
01 in OCT’20+01 in DEC’20
|
ECoR
|
01
|
01
|
|
--
|
|
01 in NOV’20
|
NR
|
02
|
02
|
|
-
|
|
02 in Mar’23(GZB)DD
|
NCR
|
01
|
|
|
01
|
|
|
SR
|
01
|
01
|
|
--
|
|
01 in NOV’20
|
SCR
|
01
|
01
|
|
--
|
|
01 IN AUG20 (KZJ)
|
SER
|
02
|
01
|
|
01
|
|
01 in DEC’20
|
SECR
|
01
|
01
|
|
--
|
|
01 in NOV’20(BSP)
|
WCR
|
02
|
02
|
|
-
|
|
01 IN MAR21(TKD)+ 01 in Mar’23(TKD)DD
|
2
|
PB no. 1266/21-22,298/22-23,247/23-24
(New Acquisition 2021-22)
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
Total Qty – 15 L/sets.
|
CR
|
02
|
02
|
|
-
|
|
+ 02 in Mar’23(AQ)DD
|
ECR
|
02
|
01
|
01
|
--
|
|
01 in JUNE21+01 IN APR 23(GMO) DD
|
ECoR
|
01
|
01
|
|
00
|
|
01 IN JAN’23(VSKP)DD
|
NR
|
02
|
|
|
02
|
|
|
NCR
|
01
|
|
01
|
--
|
|
01 IN APR 23(CNB) DD
|
SR
|
01
|
01
|
|
-
|
|
01 in Mar’23(RPM)DD
|
SCR
|
01
|
01
|
|
00
|
|
01 IN JAN’23(KZJ)DD
|
SER
|
02
|
02
|
|
-
|
|
02 in Mar’23(TATA)DD
|
SECR
|
01
|
|
01
|
--
|
|
01 IN APR 23(BIA) DD
|
WCR
|
01
|
01
|
|
-
|
|
01 in Mar’23(NKJ)DD
|
SWR
|
01
|
01
|
|
-
|
|
01 in Mar’23(KJM)DD
|
Against Requisition
|
|
Total against Board’s RSP
|
|
30
|
23
|
03
|
04
|
|
|
|
Total Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
30
|
23
|
03
|
04
|
|
|
PROVISION OF COMPOSITE CONVERTER FOR WAP-5 LOCOS ( Qty in Loco Set )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
1.
|
PB no. 1263/21-22, 295/22-23,244/23-24
(New Acquisition 2021-22)
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
(Re-distribution vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1
dt 16.09.21)
Total Qty – 50 sets.
|
ER
|
20
|
20
|
|
00
|
|
02 in Aug 21+01 in APR’22+06 in JULY ‘22(DD)+ 04 in Aug’22(DD) +02 IN SEPT’22(DD)+05 in DEC’22(DD)(KPA)
|
NR
|
30
|
28
|
|
02
|
|
04 in JULY ‘22(DD) +10 IN SEPT’22+07 in NOV’22)+03 in DEC’22(DD)(GZB) )+04 in FEB’23(DD)(GZB)
|
|
|
Total against Board’s RSP
|
|
50
|
48
|
|
02
|
|
|
|
Total Against Requisition
|
|
--
|
|
|
--
|
|
|
|
Grand Total
|
|
50
|
48
|
|
02
|
|
|
CONVENTIONAL BRAKE RIGGING IN WAG-9 LOCO.( Qty in loco Sets)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
PB. No. 1203/ 19-20, 448/20-21, 363/21-22, 265/22-23
214/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
196
|
|
|
196
|
|
|
ECR
|
197
|
|
|
197
|
|
|
Eco
|
100
|
|
|
100
|
|
|
NR
|
22
|
|
|
22
|
|
|
NCR
|
15
|
|
|
15
|
|
|
SCR
|
150
|
|
|
150
|
|
|
SER
|
200
|
|
|
200
|
|
|
SECR
|
100
|
|
|
100
|
|
|
WCR
|
120
|
|
|
120
|
|
|
|
Total against Board’s RSP
|
|
1100
|
|
|
1100
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
1100
|
|
|
1100
|
|
|
Access Tool / Diagnostic System (3-Phase) ( QTY IN LOCO SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
1.
|
P.B.No.- 1211/17-18 , 366/18-19 , 353/19-20, 353/20-21, 277/21-22, 189/22-23,143/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 05.04.17)
|
CR/
|
05
|
05
|
|
-
|
|
03 In Sep18+01 In Oct18+01 In Nov18
|
ER/
|
03
|
03
|
|
-
|
|
01 In Sep18+02 In Feb19
|
ECR/
|
05
|
04
|
|
01
|
|
02 Insep18+02 In Nov18
|
ECOR/
|
04
|
04
|
|
-
|
|
02 In Oct 18
|
NR/GZB
|
06
|
06
|
|
-
|
|
04 Supplied In July18+ 02 in April’19
|
NCR/
|
02
|
02
|
|
|
|
01 In Dec18
|
SR/
|
04
|
04
|
|
-
|
|
01 In Sep18+03 In Nov18
|
SCR/
|
04
|
04
|
|
-
|
|
02 Supplied In July18+02 In Nov18
|
SER/
|
05
|
05
|
|
-
|
|
02 In Sep18+03 In Feb19
|
SECR/
|
04
|
04
|
|
-
|
|
02 In Nov18
|
WR/
|
04
|
04
|
|
-
|
|
02 In Oct18+02 In June19
|
WCR/NKJ
|
04
|
04
|
|
-
|
|
02 Supplied In July18+02 Tkd Nov18
|
2.
|
P.B.No.-1187/18-19 , 394/19-20, 393/20-21, 308/21-22,216/22-23,167/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 02.04.18)
|
CR/
|
06
|
|
|
06
|
|
|
ER/
|
03
|
|
|
03
|
|
|
ECR/
|
04
|
|
|
04
|
|
|
ECOR/
|
04
|
|
|
04
|
|
|
NR/
|
08
|
|
|
08
|
|
|
NCR/
|
01
|
|
|
01
|
|
|
NER/
|
01
|
|
|
01
|
|
|
SR/
|
02
|
|
|
02
|
|
|
SCR/
|
05
|
|
|
05
|
|
|
SER/
|
05
|
|
|
05
|
|
|
SECR/
|
03
|
|
|
03
|
|
|
WR/
|
04
|
|
|
04
|
|
|
WCR/
|
04
|
01
|
|
03
|
|
SUPPLY IN DEC18 (ET)
|
3.
|
PB. No. 1193/19-20, 438/20-21,
353/21-22, 256/22-23,206/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
08
|
|
|
08
|
|
|
ER
|
08
|
|
|
08
|
|
|
ECR
|
09
|
|
|
09
|
|
|
Eco
|
09
|
|
|
09
|
|
|
NR
|
09
|
|
|
09
|
|
|
NCR
|
08
|
|
|
08
|
|
|
SR
|
08
|
|
|
08
|
|
|
SCR
|
08
|
|
|
08
|
|
|
SER
|
08
|
|
|
08
|
|
|
SECR
|
08
|
|
|
08
|
|
|
WR
|
08
|
|
|
08
|
|
|
WCR
|
09
|
|
|
09
|
|
|
4
|
PB no. 1305/20-21, 384/21-22, 286/22-23,235/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 100 sets
|
CR
|
09
|
|
|
09
|
|
|
ER
|
08
|
|
|
08
|
|
|
ECR
|
08
|
|
|
08
|
|
|
Eco
|
08
|
|
|
08
|
|
|
NR
|
09
|
|
|
09
|
|
|
NCR
|
08
|
|
|
08
|
|
|
SR
|
08
|
|
|
08
|
|
|
SCR
|
09
|
|
|
09
|
|
|
SER
|
09
|
|
|
09
|
|
|
SECR
|
08
|
|
|
08
|
|
|
WR
|
08
|
|
|
08
|
|
|
WCR
|
08
|
|
|
08
|
|
|
|
Total against Board’s RSP
|
|
300
|
50
|
|
250
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
300
|
50
|
|
250
|
|
|
REMOTE Monitoring (3-Phase) (D&D) ( QTY IN LOCO SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
q Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 1055/11-12,353/12-13,328/13-14,329/14-15, 303/15-16, 257/16-17,257/17-18,205/18-19 , 198/19-20, 198/20-21, 152/21-22 , 104/22-23,72/23-24
(Vide RB’s L/N.- 2011/Elect.(TRS)/441/2 dt.- 11.05.11)
|
CR /
|
09
|
|
|
09
|
|
|
ECR /
|
09
|
09
|
--
|
--
|
|
09 in DEC’20
|
NR /
|
10
|
10
|
|
--
|
|
10 in DEC19
|
SCR /
|
05
|
05
|
|
--
|
|
05 in JAN 20
|
SECR /
|
05
|
05
|
|
--
|
|
05 IN AUG19
|
SER /
|
02
|
|
|
02
|
|
|
SR /
|
05
|
05
|
|
--
|
|
05 IN JAN20
|
WCR /
|
05
|
01
|
|
04
|
|
01 IN JULY 21
|
-
|
P.B.No.- 1118/12-13,375/13-14,376/14-15, 347/15-16,291/16-17 , 291/17-18, 235/18-19 , 227/19-20,
227/20-21, 176/21-22, 122/22-23 ,87/23-24
(Vide R.B. L/N.- 2012/Elect.(TRS)/441/1 dt.- 29.05.2012)
|
CR /
|
20
|
|
|
20
|
|
|
ECR /
|
20
|
20
|
|
--
|
|
20 in DEC’20
|
NR /
|
15
|
15
|
|
--
|
|
10 in DEC19 + 01
fitted with loco JAN20 + 04 in FEB20
|
SCR /
|
25
|
25
|
|
--
|
|
25 IN JAN20
|
SECR /
|
10
|
10
|
|
--
|
|
05 IN AUG19+01
fitted with loco FEB20++ 04 in March’21
|
WCR /
|
10
|
|
|
10
|
|
|
-
|
P.B.No.- 1220/17-18 , 375/18-19 , 362/19-20, 362/20-21, 286/21-22, 196/22-23,149/23-24
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 05.04.17)
|
CR/
|
15
|
|
|
15
|
|
|
ER/
|
10
|
|
|
10
|
|
|
ECR/
|
15
|
|
|
15
|
|
|
ECOR/
|
10
|
10
|
|
|
|
10 in March’21
|
NR/
|
20
|
|
|
20
|
|
|
NCR/
|
10
|
|
|
10
|
|
|
SR/
|
10
|
10
|
|
--
|
|
10 IN NOV 20
|
SCR/
|
05
|
01
|
|
04
|
|
01 fitted with loco
(Oct 20 to LGD)
|
SER/
|
15
|
|
|
15
|
|
|
SECR/
|
15
|
11
|
|
04
|
|
11 in March’21
|
WR/
|
10
|
|
|
10
|
|
|
WCR/
|
15
|
|
|
15
|
|
|
|
Total against Board’s RSP
|
|
300
|
137
|
|
163
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
300
|
137
|
|
163
|
|
|
E-70 Brake System (3-Phase) ( QTY IN NOS) .( Qty in loco Sets)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
1
|
PB no. 1186/ 19-20, 431/20-21, 346/21-22,
250/22-23,200/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
02
|
02
|
|
--
|
|
02 IN DEC19
|
ER
|
02
|
02
|
|
--
|
|
01 IN MAR20 +01 IN AUG20 (KPA)
|
ECR
|
02
|
02
|
|
--
|
|
01 in Nov’21+ 01 in FEB’22
|
Eco
|
02
|
02
|
|
--
|
|
02 IN AUG20
|
NR
|
02
|
02
|
|
--
|
|
01 in Sept’21+01 in Mar’22
|
NCR
|
02
|
02
|
|
--
|
|
01 in DEC’20+01 in DEC21
|
SR
|
02
|
02
|
|
--
|
|
01 IN AUG20(ED)+ 01 IN NOV20(RPM)
|
SCR
|
03
|
03
|
|
--
|
|
01 IN JULY 20 (KZJ) + 01 IN AUG20 (KZJ)+ 01 IN OCT 20 (LGD)
|
SER
|
02
|
02
|
|
--
|
|
02 IN JUNE 20
|
SECR
|
02
|
02
|
|
--
|
|
01 in Aug 21+ 01 in FEB’22
|
WR
|
02
|
02
|
|
--
|
|
01 IN JULY20 (BRCY)+01 in Nov’21
|
WCR
|
02
|
02
|
|
--
|
|
02 in SEP 20 (TKD)
|
-
|
PB no. 1299/20-21, 378/21-22, 280/22-23,229/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 30 sets
|
CR
|
03
|
03
|
|
--
|
|
01 in DEC21+01 in JAN22+01 in FEB’22
|
ER
|
02
|
02
|
|
--
|
|
01 in FEB’22+01 in APR’22
|
ECR
|
03
|
03
|
|
--
|
|
03 in FEB’22
|
ECoR
|
02
|
02
|
|
-
|
|
01 in DEC’22(VSKP)+01 IN FEB’23(VSKP)
|
NR
|
03
|
02
|
01
|
--
|
|
01 in June’22(LDH) )+ 01 in Mar’23(TKD) +01 IN AUG 23 GZB
|
NCR
|
02
|
02
|
|
-
|
|
01 IN JAN’23(CNB)+ 01 in Mar’23(CNB)
|
SR
|
02
|
01
|
01
|
00
|
|
01 in FEB’22+ 01 in May ‘23(ED)
|
SCR
|
03
|
|
|
03
|
|
|
SER
|
03
|
03
|
|
--
|
|
01 in AUG 21(SRC) +01 in Sept’21+01 in Mar’22
|
SECR
|
02
|
02
|
|
--
|
|
+02 in Mar’22
|
WR
|
02
|
|
|
02
|
|
|
WCR
|
03
|
|
|
03
|
|
|
3.
|
PB no. 1267/21-22, 299/22-23,248/23-24
(New Acquisition 2021-22)
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
Total Qty – 10 L/sets.
|
CR
|
01
|
|
|
01
|
|
|
ECR
|
01
|
01
|
|
--
|
|
01 in APR’22
|
ECoR
|
01
|
|
|
01
|
|
|
NR
|
01
|
|
|
01
|
|
|
SR
|
01
|
01
|
|
-
|
|
01 in Mar’23(RPM)
|
SCR
|
01
|
|
|
01
|
|
|
SER
|
01
|
01
|
|
--
|
|
+01 in Mar’22
|
SECR
|
01
|
01
|
|
00
|
|
01 IN JAN’23(BIA)
|
WR
|
01
|
|
01
|
00
|
|
01 in JUN 23(BL)
|
WCR
|
01
|
|
|
01
|
|
|
4.
|
PB no. 1235/22-23,278/23-24
(New Acquisition 22-23
(Allotted Vide Rly.Bd L/No- 2022/Elect.(TRS)/441/1 dt 06.04.22)
Total Qty – 15 L/sets.
|
CR
|
01
|
|
|
01
|
|
|
ER
|
01
|
|
|
01
|
|
|
ECR
|
01
|
|
|
01
|
|
|
ECoR
|
01
|
|
|
01
|
|
|
NR
|
01
|
|
|
01
|
|
|
NCR
|
01
|
01
|
|
-
|
|
01 in Mar’23(CNB)
|
NER
|
01
|
|
|
01
|
|
|
NFR
|
01
|
|
|
01
|
|
|
SR
|
01
|
|
|
01
|
|
|
SCR
|
01
|
|
|
01
|
|
|
SER
|
01
|
01
|
|
--
|
|
01 in June’22
|
SWR
|
01
|
01
|
|
--
|
|
01 in June’22(KJM)
|
SECR
|
01`
|
|
01
|
00`
|
|
01 in May ‘23(BIA)
|
WR
|
01
|
|
01
|
00
|
|
01 in JUN 23(BL)
|
WCR
|
01
|
|
|
01
|
|
|
Against Requisition .
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
80
|
52
|
05
|
23
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
80
|
52
|
05
|
23
|
|
|
NEWLY DEVELOPED DRIVER DISPLAY (3-Phase) (D&D) ( QTY IN LOCO SET )
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
-
|
P.B.No.- 1117/12-13,374/13-14,375/14-15, 346/15-16, 290/16-17,290/17-18, 234/18-19 , 226/19-20,
226/20-21, 175/21-22 , 121/22-23
(Vide R.B. L/N.- 2012/Elect.(TRS)/441/1 dt.- 29.05.2012)
|
CR / AQ
|
20
|
20
|
|
-
|
|
Fully Supplied As Per Pb Demand
|
ECR / GMO
|
20
|
20
|
|
-
|
|
01set Supply In Aug2016+03set In Mar’17+10 Set In Aug’17
|
NR /GZB
|
15
|
15
|
|
-
|
|
Nr / Gzb-03 In 15-16,+04set In Mar’17+08 Set In March18
|
SCR /LGD
|
25
|
20
|
|
05
|
|
03 Set Supplied In Feb17+02 Set In May’17+05 Set In Nov2017+03set In Feb18+02set Inapril18+05set In July18
|
SECR /BIA
|
10
|
10
|
|
-
|
|
07 Set Supplied In Mar’17+03set In May17
|
WCR /
|
10
|
10
|
|
-
|
|
Fully Supplied As Per P.B. Demand
|
Against Requisition
|
|
|
|
|
|
|
|
-
|
476211015 DT 10.11.18
|
WCR/TKD
|
25
|
05
|
|
20
|
|
02 Set In Inov18+03 Set Dec18
|
|
Total against Board’s RSP
|
|
100
|
95
|
|
05
|
|
All Quantities Are In Sets / 02 Nos Adjusted For Cr Against Req To Rsp
|
|
Against Requisition
|
|
25
|
05
|
|
20
|
|
|
|
Grand Total
|
|
125
|
100
|
|
25
|
|
|
|
|
|
|
|
|
|
|
|
|
2X500 KVA HOTEL LOAD CONVERTER (3-Phase) (D&D) ( QTY IN SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 1062/11-12,360/12-13,335/13-14,336/14-15, 310/15-16,263/16-17, 263/17-18,211/18-19, 204/19-20, 204/20-21, 158/21-22, 109/22-23 ,75/23-24
(Vide RB’s L/N.- 2011/Elect.(TRS)/441/2 dt.- 11.05.11)
Revised distribution CEE/D&D L/No – EL/L/110/CSP TO BD Dt 20.08.2018
|
NR /
|
10
|
08
|
|
00
|
|
03 IN JULY19+ 4 in July 21+01 no adjusted against PO.No.70211125101655 DT:- 24.11.21
|
WCR/TKD
|
02
|
|
|
01 Set In Aug18+01in Sep18
|
-
|
P.B.No.- 1190/14-15,430/15-16, 354/16-17,354/17-18, 294/18-19 , 283/19-20, 283/20-21, 226/21-22, 151/22-23, 110/23-24
(Vide RB L/N.- 2014/Elect(TRS)/441/2 dt.- 06.08.2014)
|
NR
|
05
|
05
|
|
00
|
|
To Be Provided On Clw Built Loco +05 adjusted against PO. 70211125101487 DT:- 25.10.21
|
-
|
PB no. 1290/20-21, 369/21-22, 271/22-23,220/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 375 sets
(Re-distribution vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1
dt 16.09.21) Total Qty – 150 sets.
(Re-distribution vide Rly.Bd L/No- 2023/Elect.(TRS)/441/1
dt 04.07.21) Total Qty – 187 sets.
|
ER
|
29
|
16
|
|
13
|
|
01 IN MAY21+01 IN Aug 21+12 in JULY 22(DD)+ 02 in Aug’22(DD)
|
ECoR
|
20
|
16
|
|
04
|
|
04 IN APRIL21+01 IN MAY21+11 in JULY 22(DD)
|
SR
|
52
|
27
|
|
25
|
|
01 IN APRIL21(RPM)+ 03 in JULY21+01 IN Aug 21+22 in JULY 22(DD)
|
SCR
|
29
|
08
|
|
21
|
|
+08 in JULY 22(DD)
+Excess sup 46 nos. in JULY22(DD)(CR-10,ECR-01,NR-11,SER-07,SECR-02,WR-03,WCR-12)
|
CR
|
20
|
10
|
|
10
|
|
Adjusted the supply position after
Re-distribution
JULY22(DD)(CR-10,ECR-01,NR-11,SER-07,SECR-02,WR-03,WCR-12
|
ECR
|
01
|
01
|
|
00
|
|
NR
|
11
|
11
|
|
00
|
|
SER
|
07
|
07
|
|
00
|
|
SECR
|
03
|
03
|
|
00
|
|
WR
|
03
|
03
|
|
00
|
|
WCR
|
12
|
12
|
|
00
|
|
|
Total against Board’s RSP
|
|
202
|
129
|
|
73
|
|
Sup. Before re-distribution SER-06 in 21-22,SECR-01 in 21-22,WCR-04 in 21-22+
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
202
|
129
|
|
73
|
|
|
DPWCS (3-Phase) (D&D) ( QTY IN LOCO SET )
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 1122/12-13,379/13-14,380/14-15,351/15-16,295/16-17, 295/17-18,239/18-19 , 231/19-20,
231/20-21, 180/21-22 ,125/22-23,89/23-24
(Vide R.B. L/N.- 2012/Elect.(TRS)/441/1 dt.- 29.05.2012) (quantity in Loco sets (Set = 02 nos)
Re Distributed Vide L/N- 2018/Elect(TRS)/441/3 dt 15.02.2019
|
CR
|
06
|
|
|
06
|
|
|
ER
|
06
|
06
|
|
--
|
|
03 In Feb19 +03 in Mar21
|
NR
|
06
|
05
|
|
01
|
|
05 In Feb19
|
SR
|
06
|
03
|
|
03
|
|
03 In Mar19
|
SCR/KZJ
|
01
|
01
|
-
|
--
|
|
Fitted In Loco
|
SER /
|
12
|
12
|
|
-
|
|
04 NOS 18.01.18 +06 NOS 06.07.18+ 02 NOS IN 10.12.18
|
WR/BRCY
|
07
|
04
|
|
03
|
|
Redistribution Vide L/No- C-D&D/T/34(Part) Dt 18.01.2018.+03 In Feb19
|
WCR
|
06
|
03
|
|
03
|
|
03 In Feb19
|
EcoR/VSKP
|
--
|
01
|
|
-
|
|
Fitted Directly In Loco
|
-
|
P.B.No.- 1060/11-12,358/12-13,333/13-14,334/14-15, 308/15-16, 261/16-17,261/17-18, 209/18-19,202/19-20,
202/20-21, 156/21-22 , 107/22-23.73/23-24
(Vide R.B. L/N.- 2013/Elect.(TRS)/441/3dt.- 22.05.2013)
Redistributed Vide R.B. L/N.- 2017/Elect.(TRS)/441/1 dt.- 05.04.2017quantity in Loco sets (Set = 02 nos)
|
CR /
|
03
|
03
|
|
--
|
|
|
ECR /
|
05
|
05
|
|
-
|
|
01 In Oct18+04 In Nov18
|
SCR
|
06
|
06
|
|
--
|
|
|
SER /
|
04
|
04
|
|
--
|
|
04 NOS IN 10.12.2018
|
SECR /
|
07
|
07
|
|
-
|
|
07 In Aug’19
|
-
|
PB no. 1239/22-23
(New Acquisition 22-23
(Allotted Vide Rly.Bd L/No- 2022/Elect.(TRS)/441/1 dt 06.04.22
Reditribution L/no. 2022/Elect.(TRS)/441/1 dt 30.06.22 )
Redistribution L/no.2022/Elect(TRS)/441/1 dt.03.03.2023
Total Qty – 300sets.
|
CR
|
15
|
|
|
15
|
|
|
ECR
|
20
|
|
|
20
|
|
|
ECoR
|
35
|
|
|
35
|
|
|
NR
|
25
|
|
|
25
|
|
|
NCR
|
10
|
|
|
10
|
|
|
SCR
|
30
|
|
|
30
|
|
|
SER
|
55
|
|
|
55
|
|
|
SECR
|
75
|
|
|
75
|
|
|
WR
|
15
|
|
|
15
|
|
|
WCR
|
20
|
|
|
20
|
|
|
|
Total against Board’s RSP
|
|
375
|
59
|
|
316
|
|
All Quantity In Loco Sets (Set = 02 Nos)
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
375
|
59
|
|
316
|
|
|
HB1 / HB2 Panel (3-Phase)
Against Board’s RSP
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
-
|
P.B.No.- 871/08-09,251/09-10,251/10-11,196/11-12, 172/12-13,151/13-14,151/14-15,144/15-16, 138/16-17, 104/18-19 , 99/19-20. 99/20-21, 79/21-22,62/22-23
(Vide Rly. Bd.s L/N.- 2013/Elect.(TRS)/441/1 dt.- 01.05.2013)
|
CR /
|
02
|
02
|
|
-
|
|
02 in May19
|
ECR /
|
02
|
01
|
|
01
|
|
01 in Jan’22
|
ER / KPA
|
02
|
02
|
|
|
|
02 IN MAR20
|
ER / HWH
|
01
|
01
|
|
-
|
|
Fully Supplied As Per P.B. Demand
|
NR /
|
02
|
02
|
|
-
|
|
Supplied To Gzb+01 in June19
|
SCR /
|
02
|
|
|
02
|
|
|
SECR /
|
02
|
02
|
|
-
|
|
Supplied To Bia JULY2014+01 IN SEP19
|
SER /
|
01
|
01
|
|
|
|
01 in May19
|
SR /
|
01
|
01
|
|
-
|
|
01 SET MAY19
|
WCR /
|
02
|
|
|
02
|
|
|
WR / BRCY
|
01
|
01
|
|
-
|
|
01 Supply in JULY19
|
Against P.O.
|
|
|
|
|
|
|
|
-
|
PO NO – 22145122801416 DT 22.02.2019
( Qty in Loco Set )
PO PLACED FOR HB2 PANEL ONLY BY BRCY/WR
|
CR/KYN
|
01
|
|
|
01
|
|
|
ER/KPA
|
01
|
|
|
01
|
|
|
ECR/GOMO
|
01
|
|
|
01
|
|
|
NR/GZB
|
01
|
|
|
01
|
|
|
SR/RPM
|
01
|
01
|
|
-
|
|
01 SUPPLIED IN MAY19
|
SCR/LGD
|
01
|
|
|
01
|
|
|
SER/TATA
|
01
|
|
|
01
|
|
|
SEC/BIA
|
01
|
01
|
|
-
|
|
01 IN SEP19
|
WCR/TKD
|
01
|
|
|
01
|
|
|
WR/BRCY
|
01
|
01
|
|
-
|
|
01 Set in June19
|
-
|
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
18
|
13
|
|
05
|
|
All Quantity In Loco Sets (Set = 02 Nos)
|
|
Against Requisition + P.O.
|
|
10
|
03
|
|
07
|
|
|
|
Grand Total
|
|
28
|
16
|
|
12
|
|
|
High Reach Pantograph ( QTY IN NOS )
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
-
|
P.B.No.- 1129/12-13,386/13-14,387/14-15,358/15-16, 302/16-17,302/17-18 , 246/18-19 , 238/19-20,
238/20-21, 187/21-22, 129/22-23,93/23-24
(P.O. AS BELOW ) :
1)PO NO -34/2012/2948/33298 DT 05.02.2014 – 156 (132NOS RSP)
ON SHUNK INDIA ( MATERIAL DELIVERED 2016-17)
2)PO NO -34/2012/2948/33290 DT 07.03.2014 – 84 (68 NOS RSP)
ON STONE INDIA
3)PO NO -34/2016/2948/36927 DT25.11.2016 - 06NOS(RSP)
ON FAIVERLEY TRANSPORT
4)PO NO -34/2016/2948/36926 DT 25.11.2016 – 66NOS(RSP)
ON CONTRANSYS PVT LTD
5)PO NO -34/2016/2948/36925 DT 25.11.2016 – 28NOS(RSP)
ON SHUNK INDIA
6) 14/2017/2948/38884 dtd 02.04.2018 – 468 nos.E-70
(Vide R.B. L/N.- 2012/Elect.(TRS)/441/1 dt.- 29.05.2012)
PO NO. 34182948102040 DT:- 26.09.19 (MA No. 000023 dt:- 02.01.2020) – 500 nos (205 nos RSP) on M/s SCHUNK METAL/BANGALORE
KYN-35 sets , TKD-40 sets, SRC-10 sets (comp), VSKP-25 sets, CNB-25 sets, HWH-30 sets (comp), AJNI-25 (comp) sets & KZJ-15 sets)
|
CR /
|
85
|
85
|
|
-
|
|
26 DD+08 To Kyn In Aug18+08 In Nov18+04 In Dec18+25 in April 20 (DD)
14 in Feb 22 (DD)
|
EcoR / VSKP
|
85
|
37
|
|
48
|
|
As Per L/N.- Wat/Trs/S-6/ 83 Dt.- 02.01.2014+ 25 in Mar’22(DD)
|
ECR /GOMOH
|
85
|
04
|
|
81
|
|
04 In Dec18
|
ER /
|
75
|
30
|
|
45
|
|
30 DD IN MAR20(HWH)
|
NCR /
|
85
|
64
|
21
|
00
|
|
04 In Dec18+08in Feb19+ 025 in FEB’22+17(12+5) IN APR23 JHS(DD)+04 in JULY 23 (CNB) DD
|
NR /
|
85
|
85
|
|
-
|
( 08 ADJUSTED WITH PANTO AM-92 IN NOV18)
|
21dd+20 Nos In Nov18+18 In Dec18+12 in March’19(DD)+12 GZB IN May19(DD)+ 02HR/DD/GZB SEP19
|
SCR /
|
85
|
83
|
02
|
00
|
|
20DD+08AR In Feb19+(4HR+12AR In Mar19)+16 AR to KZJ MAY19+08 AR BZA MAY19+15 in Mar’22(DD)+ 02 in May ‘23(LGD)DD
|
SECR /
|
75
|
23
|
|
52
|
|
08 In Feb19
|
SER /
|
85
|
66
|
|
19
|
|
08 In Dec18+8ar In Mar19+08 in April’19+08AR to SRC in May19+08AR to SRC in June19+16 IN JULY19+ 10 DD IN MAR20 (SRC)
|
SR /
|
85
|
12
|
|
73
|
|
01 in FEB 22
|
WCR /
|
85
|
76
|
|
09
|
|
+10 in Mar’22(DD)+ 36 in APR’22 TKD(DD)
|
WR / BRCY/BL
|
85
|
85
|
|
-
|
|
Vide Cee/Wr/Hq’s L/N.- El 91/39/1 Dt.- 09.01.15, 02 Nos Supplied In Mar’17+04 In July18+15 In Aug18+08 In Jan19+08 In Jan19+04 In Feb19+12 Nos HR in June19(DD)to BL+12 Nos HR in AUG19(DD) to BL+18 Nos in SEP2019/DD BRCY+02 HR/DD/BL SEP19
|
2.
|
P.B.No. – 1166/16-17, 405/17-18,336/18-19 , 323/19-20
323/20-21, 256/21-22,172/22-23,128/23-24
(Vide RB’s L/N.- 2016/Elect.(TRS)/441/1 dt.- 18.05.2016 )
Re distribution as per L/No.2023/Elect(TRS)/441/1
Dt. 26/5/23
|
CR /
|
40
|
31
|
07
|
02
|
|
21 in Feb 22 (DD) +10 IN SEPT’22(DD)BSL+07 in JUN 23(KYN) DD
|
ER /
|
100
|
04
|
|
96
|
|
+04 in Mar’22+02 in june’22
|
ECR /
|
80
|
|
|
80
|
|
|
EcoR /
|
30
|
|
|
30
|
|
|
NR
|
460
|
175
|
10
|
275
|
|
24 AR in JUNE19+12 HR (DD) to GZB in June19+ 12 Nos HR ,DD GZB JULY19 +10HR/DD/GZB SEP19 +02 IN JAN20+10 IN June21(DD)+ 10 IN Nov 21(DD)+ 10 in Feb 22 (DD)+ 06 in OCT’22(DD)/KJGY+04 inNOV’22(DD)(LDH) +32(10+12+10) in DEC’22(DD)(GZB) +24(6+6+12) IN JAN’23(GZB)DD+ 19 IN FEB’23(GZB)(DD) +10 in May ‘23(GZB)DD
|
NCR
|
200
|
|
16
|
184
|
|
+16 in JULY 23 (CNB) DD
|
NWR
|
360
|
|
|
360
|
|
|
SR
|
40
|
|
|
40
|
|
|
SCR
|
40
|
|
40
|
00
|
|
40 (5+35) in May’23(LGD)DD
|
SECR
|
40
|
04
|
|
36
|
|
+ 02 in Mar’22+ 02 in Mar’22
|
WR
|
500
|
328
|
25
|
147
|
|
56 HR/DD TO WR(46BRCY+10BL)+12 HR/DD BRCY NOV19 + 54 in DEC19 + 28 in JAN20(BRCY) +10 IN June21(DD)+ 10 IN Aug21(DD/BL) +05 in OCT’21+ 178(25+153) nos. adjusted from PB 249/23-24
|
WCR
|
110
|
10
|
|
100
|
|
08 in Nov’21+02 in APR’22
|
3.
|
PB no. 1268/21-22, 300/22-23, 249/23-24
(New Acquisition 2021-22)
(Allotted Vide Rly.Bd L/No- 2021/Elect.(TRS)/441/1 dt 16.04.21)
Total Qty – 1000 nos.
19 nos. supply PLW to WR vide L/no.2005/Elect/TRS/440/10/Pt.II dt. 07/6/22
Revised Total Qty.:-- 981 nos
Re distribution as per L/No.2023/Elect(TRS)/441/1
Dt.16/6/23
|
CR
|
30
|
|
30
|
00
|
|
30 nos in JUN 23(KYN) DD
|
ER
|
02
|
02
|
|
00
|
|
|
ECR
|
50
|
|
|
50
|
|
|
NR
|
496
|
59
|
36
|
401
|
|
47 IN FEB’23(GZB)(DD) 12 in Mar’23(GZB)DD+36(12+12+9+3) IN APR 23 GZB(DD)
|
NCR
|
87
|
|
|
87
|
|
|
NER
|
14
|
04
|
|
10
|
|
04 IN JAN’23(GD)
|
NFR
|
05
|
|
|
05
|
|
|
SR
|
07
|
|
|
07
|
|
|
SCR
|
28
|
|
28
|
00
|
|
28 in May ‘23(LGD)DD
|
SER
|
06
|
|
|
06
|
|
|
SWR
|
06
|
|
|
06
|
|
|
WR
|
81
|
81
|
00
|
00
|
|
03 in OCT’21+02 in Nov’21+15 in DEC21+ 04 in FEB’22+ 16 in FEB’22+ 08 in FEB’22+08 in Feb22+(4+4+6)=14 in APR’22+10 NOS. in JULY 22(DD) +50(12+06+10+10+12)(Excess sup. 49nos) in DEC’22(DD)(BRCY)+ (Excess sup. 60nos) in FEB’23(DD)(BRCY)
+ 44(12+12+08+12) in Mar’23(BRCY)DD+25(10+07+08)IN APR 23 BRCY(DD) * 25+153=178 shifted to PB No.128/23-24
|
WCR
|
169
|
|
|
169
|
|
|
4.
|
PB NO.1238/23-24
TOTAL QTY.=1000 NOS
(Allotted Vide Rly.Bd L/No- 2023/Elect.(TRS)/441/1 dt 11.04.2023)
Re distribution as per L/No.2023/Elect(TRS)/441/1
Dt.16/6/23
|
CR
|
40
|
|
|
40
|
|
|
ECR
|
60
|
|
|
60
|
|
|
NR
|
589
|
|
|
589
|
|
|
NCR
|
87
|
|
|
87
|
|
|
NER
|
29
|
|
|
29
|
|
|
NFR
|
07
|
|
|
07
|
|
|
SR
|
07
|
|
|
07
|
|
|
SER
|
06
|
|
|
06
|
|
|
SWR
|
06
|
|
|
06
|
|
|
WCR
|
169
|
|
|
169
|
|
|
|
Total against Board’s RSP
|
|
4981
|
1348
|
215
|
3418
|
|
(Excess sup. 49nos) in DEC’22(DD)(BRCY)+ (Excess sup. 60nos) in FEB’23(DD)(BRCY)
|
-
128 nos Air raise panto adjusted against High Reach Panto (NR-36,SCR-44,SER-48)
-
304 nos Direct Delivery high reach Pantograph to sheds.
-
15 nos AM92/12 pantograph (6 nos CR, 2 nos ECoR,06 nos NR, 01 nos SR) supplied which adjusted against High reach pantograph
-
138 nos High Reach pantograph spared from CLW
High Speed Pantograph ( AM-92 Type ) ( QTY IN NOS )
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
-
|
P.B.No.-178/18-19 (B) , 98/19-20 (B) , 98/20-21 (B), 72/21-22(B), 46/22-23(B), 38/23-24(B)
(Allotted Vide Rly.Bd L/No-2017/Elect.(TRS)/441/1 dt 02.04.18)
|
CR/
|
03
|
03
|
|
--
|
|
01 In Oct18+ 02 in MARCH 21
|
ER/
|
03
|
03
|
|
--
|
|
02 Supplied In Aug18 + 01 in DEC19
|
ECR/
|
05
|
05
|
|
-
|
|
02 in may19+03 IN NOV19
|
NR/GZB
|
10
|
10
|
|
-
|
|
02 Supplied In July18+08 In Nov18
|
NCR/
|
03
|
03
|
|
|
|
03 In Nov18
|
NER/
|
02
|
|
|
02
|
|
|
SR/
|
02
|
02
|
|
-
|
|
02 IN OCT19
|
SCR/
|
02
|
02
|
|
-
|
|
02 Supplied In July18
|
SER/
|
02
|
02
|
|
-
|
|
02 Supplied In May19
|
SECR/
|
02
|
02
|
|
-
|
|
02 Supplied in Aug19
|
WR/BRCY
|
04
|
02
|
|
02
|
|
02 Supplied In July18
|
WCR/
|
12
|
10
|
|
02
|
|
02 In June18+04 In July18+04 IN DEC 20 (ET)
|
2.
|
PB. No. 170/19-20 (B), 100/20-21 (B),
74/21-22(B), 48/22-23(B), 40/23-24(B)
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
08
|
|
|
08
|
|
|
ER
|
09
|
09
|
|
-
|
|
09 in DEC19
|
ECR
|
08
|
08
|
|
--
|
|
04 IN OCT19+01 IN NOV19 + 01 in FEB21+02 IN JUNE21
|
Eco
|
06
|
06
|
|
--
|
|
06 IN MAR20
|
NR
|
09
|
09
|
|
--
|
|
09 in JAN-20(GZB)
|
NCR
|
06
|
06
|
|
-
|
|
06 in DEC19
|
NER
|
04
|
04
|
|
--
|
|
04 in NOV20
|
SR
|
09
|
09
|
|
--
|
|
02 IN JULY20 (ED)+ 06 IN DEC 20 (AJJ)+01 in OCT’21
|
SCR
|
09
|
09
|
|
--
|
|
05 in DEC19 + 04 in NOV20
|
SER
|
08
|
|
|
08
|
|
|
SECR
|
06
|
06
|
|
-
|
|
04 NOS IN SEP19+02 in OCT19
|
WR
|
09
|
|
|
09
|
|
|
WCR
|
09
|
|
|
09
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
1
|
|
|
|
|
|
|
|
|
|
Total against Board’s RSP
|
|
150
|
110
|
|
40
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
150
|
110
|
|
40
|
|
|
CREW VOICE & VIDEO RECORDING SYSTEM (CVVRS)
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
|
|
|
|
|
|
|
-
|
PB. No.1196/ 19-20, 441/20-21, 356/21-22,
259/22-23, 209/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
500
|
|
|
500
|
|
|
ER
|
200
|
|
|
200
|
|
|
ECR
|
500
|
|
|
500
|
|
|
Eco
|
400
|
|
|
400
|
|
|
NR
|
450
|
|
|
450
|
|
|
NCR
|
350
|
|
|
350
|
|
|
NE
|
50
|
|
|
50
|
|
|
SR
|
400
|
|
|
400
|
|
|
SCR
|
500
|
|
|
500
|
|
|
SER
|
600
|
|
|
600
|
|
|
SECR
|
200
|
|
|
200
|
|
|
WR
|
350
|
|
|
350
|
|
|
WCR
|
500
|
|
|
500
|
|
|
|
Total against Board’s RSP
|
|
5000
|
|
|
5000
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
5000
|
|
|
5000
|
|
|
30 KW OIL COOLING BLOWER (OCB)
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
-
|
PB. No. 1192/ 19-20, 437/20-21, 352/21-22,
255/22-23, 205/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
10
|
10
|
|
--
|
|
06 IN NOV19+02 IN JULY21+ 02 in Mar’22
|
ER
|
06
|
02
|
|
04
|
|
02 in FEB’22
|
ECR
|
10
|
08
|
|
02
|
|
02 IN OCT’20+02 in Nov’21+02 in DEC21+02 in FEB’22
|
Eco
|
07
|
07
|
|
--
|
|
04 IN NOV19 + 03 IN MAR20
|
NR
|
10
|
10
|
|
--
|
|
04 NOS SUPPLIED IN SEP19/GZB+04 LDH+02 in DEC21
|
NCR
|
07
|
07
|
|
--
|
|
03 in DEC19 + 04 in JAN20
|
SR
|
06
|
06
|
|
-
|
|
06 IN OCT19
|
SCR
|
10
|
10
|
|
--
|
|
05 IN NOV19 LGD+04 KZJ
+01 DEC19
|
SER
|
10
|
10
|
|
--
|
|
02 in OCT 19+ 02 in DEC19+ 04 in NOV20 (SRC)+02 IN JULY21
|
SECR
|
08
|
08
|
|
-
|
|
08 IN OCT19
|
WR
|
06
|
06
|
|
--
|
|
03 IN NOV19 + 01 IN DEC19+ 02 IN JULY20
|
WCR
|
10
|
10
|
|
--
|
|
04 IN NOV19 +02 in JAN20+02 IN MARCH20+ 02 IN SEP20 (TKD)
|
2.
|
PB no. 174/20-21 (B), 75/21-22(B), 49/22-23(B),
41/23-24(B)
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 100 sets
|
CR
|
10
|
|
|
10
|
|
|
ER
|
06
|
|
|
06
|
|
|
ECR
|
10
|
|
|
10
|
|
|
Eco
|
07
|
02
|
|
05
|
|
02 in Nov’21
|
NR
|
10
|
02
|
|
08
|
|
02 in Mar’22
|
NCR
|
07
|
|
|
07
|
|
|
SR
|
06
|
06
|
|
--
|
|
03 IN JULY21+02 in OCT’21+ 01 in FEB’22
|
SCR
|
10
|
09
|
|
01
|
|
04 IN JUNE21+05 NOS in JULY 22(DD)
|
SER
|
10
|
10
|
|
--
|
|
04 in Sep’21+01 in DEC21+02 in JAN22+ 02 in FEB’22+01 in Mar’22
|
SECR
|
07
|
07
|
|
--
|
|
04 in Aug 21+02 in OCT’21+ 01 in FEB’22
|
WR
|
07
|
06
|
|
01
|
|
04 IN JULY20+ 02 in FEB’22
|
WCR
|
10
|
10
|
|
--
|
|
02 IN JULY21+01 in Sept’21+03 in Nov’21+ 02 in FEB’22+02 in APR’22
|
Against Requisition
|
|
Total against Board’s RSP
|
|
200
|
146
|
|
54
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
200
|
146
|
|
54
|
|
|
Oil Cooler Radiator (QTY IN NOS)
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
|
|
|
|
|
|
|
-
|
PB. No. 1195/ 19-20, 440/20-21, 355/21-22,
258/22-23, 208/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 09.08.2019)
|
CR
|
08
|
06
|
|
02
|
|
04 IN JULY21+02 in Sept’21
|
ER
|
08
|
04
|
|
04
|
|
02 IN DEC20(KPA)+ 02 in Sept’21
|
ECR
|
09
|
09
|
|
-
|
|
04 in OCT19+05 IN NOV19
|
Eco
|
09
|
04
|
|
05
|
|
02 in March21+02 in Nov’21
|
NR
|
09
|
06
|
|
03
|
|
02 IN OCT19+02 in Sept’21+02 in DEC21
|
NCR
|
08
|
08
|
|
--
|
|
02 IN JULY21+02 in OCT’21
+02 in DEC21+02 in APR’22(DD)
|
SR
|
08
|
08
|
|
--
|
|
02 IN NOV19 + 04 IN JULY20 (ED)+ 02 IN JULY21
|
SCR
|
08
|
02
|
|
06
|
|
02 IN JAN22
|
SER
|
08
|
08
|
|
--
|
|
02 IN JULY21+04 in Sept’21+ 02 in FEB’22
|
SECR
|
08
|
07
|
|
01
|
|
04 in Aug 21+ 03 in FEB’22
|
WR
|
08
|
08
|
|
--
|
|
+ 08 in Mar’22(DD)
|
WCR
|
09
|
09
|
|
--
|
|
02 IN MAR20+04 in JULY21+02 in Sept’21+01 in OCT’21
|
-
|
PB no. 1307/20-21, 386/21-22, 288/22-23,
237/23-24
(Allotted Vide Rly.Bd L/No- 2018/Elect.(TRS)/441/3 dt 25.06.2020)
Total Qty – 100 nos.
|
CR
|
08
|
08
|
|
--
|
|
03 in FEB’22(DD)+03 in June’22(DD)+02 nos. JULY’22
|
ER
|
08
|
08
|
|
-
|
|
08 in FEB’22(DD)
|
ECR
|
08
|
08
|
|
--
|
|
07 in FEB’22(DD)+ 01 in June’22(DD)
|
ECoR
|
08
|
08
|
|
-
|
|
08 in MAY’22(DD)
|
NR
|
09
|
09
|
|
-
|
|
04 in FEB’22(DD)+ 02 in Mar’22(DD)+ 03 in MAY’22(DD)
|
NCR
|
08
|
08
|
|
--
|
|
+ 08 in Mar’22(DD)
|
SR
|
08
|
08
|
|
--
|
|
02 IN JULY21+02 IN Aug 21+02 in OCT’21+02in June’22(DD)
|
SCR
|
08
|
03
|
05
|
--
|
|
03 in MAY’22(DD)+05 in AUG 23 LGD (DD)
|
SER
|
09
|
09
|
|
--
|
|
02 in MAY’22(DD)+ 02 in MAY’22(DD)+ 02 in June’22(DD)+ 01 in June’22(DD) )+02 nos. JULY’22(DD)
|
SECR
|
08
|
08
|
|
--
|
|
01 in MAY’22(DD)+ 07 in June’22(DD)
|
WR
|
08
|
08
|
|
--
|
|
+ 08 in Mar’22(DD)
|
WCR
|
10
|
10
|
|
--
|
|
03 in OCT’21+01 in Nov’21+01 in MAY’22(DD)+ 03 in June’22(DD)+ 02 in June’22(DD)
|
Against Requisition
|
|
|
|
|
|
|
|
-
|
0462310139 DT 3.10.18
|
ECR/GOMO
|
10
|
06
|
|
04
|
|
06 SUPPLY ON 19.11.18
|
-
|
0462310035 DT 23.4.19
|
ECR/GOMO
|
18
|
|
|
18
|
|
|
|
Total against Board’s RSP
|
|
200
|
174
|
05
|
21
|
|
|
|
Against Requisition
|
|
28
|
06
|
|
22
|
|
|
|
Grand Total
|
|
228
|
180
|
|
43
|
|
|
HIGH CAPACITY OIL FREE COMPRESSOR ( QTY IN NOS )
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Board’s RSP
|
-
|
P.B.No.- 1125/12-13,382/13-14,383/14-15,354/15-16, 298/16-17,298/17-18 , 242/18-19, 234/19-20,
234/20-21, 183/21-22, 128/22-23, 92/23-24
PO NO – 70/15/1129/0997 DT 11.11.2014 FOR 50 NOS RSP
(Vide R.B. L/N.- 2012/Elect.(TRS)/441/1 dt.- 29.05.2012)
|
CR /
|
06
|
04
|
|
02
|
|
04 Set Supplied In April17
|
ECR /
|
02
|
02
|
|
-
|
|
Fully Supplied As Per P.B. Demand
|
ER /
|
06
|
|
|
06
|
|
|
NR /GZB
|
10
|
04
|
|
06
|
|
04 Not supplied As Per P.B. Demand In Mar’16
|
SCR /
|
06
|
|
|
06
|
|
|
SER /SRC
|
06
|
06
|
|
-
|
|
Fully Supplied As Per P.B. Demand In Oct’16
|
SR /
|
06
|
02
|
|
04
|
|
02 Not supplied As Per P.B. Demand In Oct’17
|
WCR / ET
|
04
|
04
|
|
-
|
|
Fully Supplied As Per P.B. Demand
|
WR / BRCY
|
04
|
04
|
|
|
Vide CEE/WR/HQ’s L/N.- EL 91/39/1 dt.- 09.01.15
|
Fully Supplied As Per P.B. Demand In Nov’16
|
|
Total against Board’s RSP
|
|
50
|
26
|
|
24
|
|
|
|
Against Requisition
|
|
|
|
|
|
|
|
|
Grand Total
|
|
50
|
26
|
|
24
|
|
|
PIVOT HOUSING
Against PO.
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against P.O.
|
|
|
|
|
|
|
|
-
|
22175146801331 DT 18.02.2019
ANNEXURE 562
|
WR/BRCY
|
01
|
01
|
|
|
|
|
NR/GZB
|
01
|
|
|
01
|
|
|
SCR/LGD
|
01
|
|
|
01
|
|
|
SER/TATA
|
01
|
01
|
|
|
|
|
SECR/BIA
|
01
|
|
|
01
|
|
|
ECR/GMO
|
01
|
|
|
01
|
|
|
CR/KYN
|
01
|
01
|
|
|
|
01 in Jan 22
|
WCR/TKD
|
01
|
01
|
|
|
|
01 IN MAR20
|
ER/KPA
|
01
|
|
|
01
|
|
|
SR/RPM
|
01
|
01
|
|
|
|
|
-
|
22175146801331 DT 18.02.2019
ANNEXURE 563
|
WR/BRCY
|
01
|
|
|
01
|
|
|
NR/GZB
|
01
|
|
|
01
|
|
|
ER/KPA
|
03
|
|
|
03
|
|
|
SR/RPM
|
01
|
|
|
01
|
|
|
SCR/LGD
|
01
|
|
|
01
|
|
|
SER/TATA
|
01
|
|
|
01
|
|
|
SECR/BIA
|
01
|
|
|
01
|
|
|
ECR/GMO
|
01
|
|
|
01
|
|
|
CR/AQ
|
01
|
01
|
|
--
|
|
01 IN Sept 21
|
WCR/TKD
|
01
|
01
|
|
--
|
|
01 IN OCT20
|
|
Total against Board’s RSP
|
|
|
|
|
|
|
|
|
Against Requisition
|
|
22
|
07
|
|
15
|
|
|
|
Grand Total
|
|
22
|
07
|
|
15
|
|
|
COMPRESSOR (QTY IN NOS).
Against Requisition
|
Sl.
|
P.B.No. / Req. No. / PO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Remarks
|
01
|
P.O. No. 22195028800733 DT 24.01.20
|
DHD/WR
|
40
|
20
|
|
20
|
10 in Feb20 + 10 in July 20
|
SET OF SPRING FOR WAG-9 LOCO
Against Requisition
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Requisition
|
|
|
|
|
|
|
|
-
|
47621992 dt 18.06.2018
|
WCR/TKD
|
10
|
|
|
10
|
|
|
|
Total against Board’s RSP
|
|
|
|
|
|
|
|
|
Against Requisition
|
|
10
|
|
|
10
|
|
|
|
Grand Total
|
|
10
|
|
|
10
|
|
|
SET OF SPRING FOR WAP-7 LOCO
Against Requisition
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Requisition
|
|
|
|
|
|
|
|
-
|
47621993 dt 18.06.2018
|
WCR/TKD
|
10
|
|
|
10
|
|
|
|
Total against Board’s RSP
|
|
|
|
|
|
|
|
|
Against Requisition
|
|
10
|
|
|
10
|
|
|
|
Grand Total
|
|
10
|
|
|
10
|
|
|
SET OF DAMPERS FOR WAP-7 LOCO
Against Requisition
|
Sl.
|
P.B.No. / Req. No. / JPO No.
|
Rly. / Shed
|
Qty. dem.
|
Supplied upto
22-23
|
Supplied during 23-24
|
Qty. balance
|
Expected supply during 22-23
|
Remarks
|
Against Requisition
|
|
|
|
|
|
|
|
-
|
47621994 dt 18.06.2018
|
WCR/TKD
|
10
|
|
|
10
|
|
|
|
Total against Board’s RSP
|
|
|
|
|
|
|
|
|
Against Requisition
|
|
10
|
|
|
10
|
|
|
|
Grand Total
|
|
10
|
|
|
10
|
|
|
|
Source : Welcome to CLW Official Website ! CMS Team Last Reviewed on: 02-09-2023
|
|
|
|