Manufacturing shops

  

विनिर्माण शॉपों का उत्पादन प्रदर्शन
(नवम्बर-2016)
 
Production Performance of Manufacturing Shops.
(November-2016)
 

क्रम सं

Sl. No.

विवरण

Description

वार्षिक लक्ष्य

Annual

Target

मासिक संचयी प्रेषण

Monthly Cumulative

Dispatch

up to Nov ’16

1.

पहिया सेट एसेम्ब्ली

Wheel set Assembly (in L/S)

300

158

2.

3- फेज़ स्टेटर

3-Ph Stator/G9/ P7 (in Nos.)

600

133

3.

3- फेज़ स्टेटर

3-Ph Stator/P5

(in Nos.)

120

27

4.

हेड स्टाक

Head Stock/P7

(in L/S)

40

27 ½

5.

310 प्रकार छोटे यंत्रांश

310 Types of Small components

300

162

6.

मोटर चालित पहिया सेट

Motorized Wheel set

576 Nos =

96 L/S

62 2/6

 
 

 

I.         Objective, Target and Performance:

a)         MFG  SHOPS:

    Sl. No.

Items

Annual

Target

Monthly

Target

Actual for

November

’2016

Cumulative 

target upto

November

’2016

Achieved

up to

November

’2016

Cumulative

Excess   (+)

Shortfall (-)

 

Overall %

 and remarks

1.

Wheel set

Assembly

(in L/S)

300

25

17

200

158

(-)42

21% less

due to Non-

availability of Axle

Box housing

(TG/TPP)

2.

3-ph Stator/G9/ P7 (in Nos.)

600

50

66

400

133

(-)267

66.75% less

Due to b/down of

MAG machine

3.

3-ph Stator/P5

(in Nos.)

120

10

07

80

27

(-)53

66.25% less

Due to b/down of

MAG machine

4.

Head Stock/P7

(in L/S)

40

03

3-1/2

24

27-1/2

(+)03-1/2

--

5.

310 Types of

Small components

(in L/S)

300

25

20

200

162

(-)38

19% less

Oxy cutting material

not provided by

shop-17

6.

Motorized Wheel set

576 Nos=

96 L/S

08

32

64

62-2/6

(-)1-4/6

1.55% less

 

b)        PLANT:

Objectives (2015-16)

Target

Achieved

To Maintain availability of 50 critical machines

90%

94.35%

               

c)    MAIN LABORATORY:

           

Total No. of sample

Total No. of Tests

No. of Rejection

% of Rejection

486

1740

07(06=Chemical, 01= R&P)

1.44

 

d)   FILTER HOUSE LABORATORY:

           

Total No. of sample

Total No. of Tests

No. of Rejection

% of Rejection

169

1036

Nil

--

 

 

 

e)    N.D.T.SECTION:

Total No. of sample

Total No. of Tests

No. of Rejection

% of Rejection

1156

3630

16(13=UT, 03=RT)

1.38

 

f)    STEEL FOUNDRY:

Total No. of sample

No. of Tests

No. of Rejection

% of Rejection

680

1815

01(Physical)

0.15

 


 
 

 

 



Source : Welcome to CLW Official Website ! CMS Team Last Reviewed on: 14-12-2016  

  Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.